My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:33:59 AM
Creation date
5/29/2019 11:23:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jack Haines -2- October 14, 1987 <br /> DHS will now proceed with having a notice published in a local <br /> Tracy newspaper, and a notice aired over a local radio station, <br /> requesting public comments on the draft Closure Plan. At the <br /> end of the 30-day comment period, DHS will decide if a Public <br /> Hearing is required to insure that the public has ample <br /> opportunity to participate in the Closure Plan approval process. <br /> DHS will make the determination on whether to hold a Public <br /> Hearing in the Tracy area at, or before, the end of the public <br /> comment period. DHS will consider all comments received during <br /> the public review period as part of the DHS final review of the <br /> draft Closure P'.an. Because of these possible comments, DHS can <br /> in no way guarantee that the draft Closure Plan will be approved <br /> as submitted. <br /> Upbn-:completion `of _the closure activities described in the <br /> Closure "Plan, DDTC and an independent qualified professional <br /> engineer, registered in California must submit a narrative report <br /> that certifies that the unit was closed in accordance with the <br /> approved Closure Plan specification. This certification of <br /> closure is required by both CAC Title 22 Section 67215 and 40 CFR <br /> Part 264 . DHS will review the certification report and will then <br /> either accept or reject the closure effort. DHS approval of the <br /> closure certification will release DDTC from further obligation <br /> to manage the above referenced tanks as hazardous waste units per <br /> State and Federal Regulations. <br /> I have enclosed a copy of the radio and newspaper Public Notices, <br /> including a Fact Sheet describing the Closure Plan. If you have <br /> any questions, please contact Donald Shaulis at (916) 739-3145 <br /> Sincerely, <br /> i <br /> Charles A. White <br /> Supervising Engineer <br /> Chief, Permitting Unit <br /> DS:ms <br /> DS2 . 107 <br /> Enclosure <br /> cc: Mr. Phil Bobel, U.S. EPA, Region IX, San Francisco <br /> Ms. Judith Walker, U.S. EPA, Region IX, San Francisco <br /> Ms. Caroline Cabias, HWMS-TSCD, Sacramento <br /> Ms. Lori Cotulla, San Joaquin County Health, Stockton <br /> Mr. Gary Rentz, RWQCB, Sacramento <br />
The URL can be used to link to this page
Your browser does not support the video tag.