Laserfiche WebLink
Closure Plan Outline (Cont 'd) <br /> B . All equipment and/or facilities requiring cleaning (e . g . , tanks , <br /> surface impoundments , drainage pits, discharge control equipment , <br /> tank trucks) . <br /> 1 . Describe each piece of equipment and/or storage facilities <br /> and procedures for cleaning (e . g . , steam-cleaning , <br /> hydroblasting , etc . ) : <br /> a . Owner or operator labor or contractor : <br /> Not applicable . No cleaning will occur , tank will be <br /> disposed of in a Class I landfill in its entirety . <br /> b . Quantity of residues from cleaning : <br /> Not applicable . No cleaning will occur . <br /> 2 . Treatment or disposal method for residues from decontamination <br /> ( including waste water and liquid wastes) : <br /> a . Quantity treated or disposed on-site and method of treatment <br /> or disposal : <br /> Not applicable . No decontamination will be performed . Tank <br /> will be disposed of in a Class I landfill in its entirety. <br /> b . Quantity sent off-site , method of treatment or disposal , and <br /> approximate distance TSDF: <br /> Not Applicable . No decontamination will be performed . <br /> IV. CLOSURE CERTIFICATION <br /> A. A schedule or estimate of the number of periodic inspections by <br /> the certifying engineer anticipated during closure : <br /> Daily inspection of all removal operations will be performed by <br /> Defense Depot Tracy, Facilities Engineering Division , and <br /> Environmental Office . San Joaquin County Environmental Health <br /> Division , Inspectors will be present before , during and after <br /> the tank is removed from its pit . <br /> 5 <br />