My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:33:59 AM
Creation date
5/29/2019 11:23:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Plan Outline (Cont ' d) <br /> b . Physcial state ( i . e . , liquid , solid , gas or mixture) : <br /> Liquid . <br /> C . Combustion temperature : <br /> Approximately 10 F . <br /> d . Specific gravity of the waste : <br /> Approximately 1 . 05 . <br /> B . Maximum amount of inventory ever on-site in any stage of processing : <br /> 250 gallons (collected) . <br /> C. Inventory of auxiliary equipment : <br /> The only auxiliary equipment pertaining to this tank is" a swivel <br /> funnel . This funnel is to remain in use and will be a part of the <br /> new collection system (please see Enclosure 3) . <br /> Upon removal of the underground tank at Building 247 , the new <br /> above ground collection method will be instituted . The new <br /> collection method will be completely enclosed with overfill <br /> protection and spill control . Waste will be collected into <br /> Dot approved 55-gallon drums . As soon as a single container <br /> has been filled , it will be removed from the collection <br /> facility and transported to the Depot ' s permitted hazardous <br /> waste holding facility (72-hours maximum) . All containers (s) , <br /> labeling , markings , storages , inspections , and disposals will <br /> be performed in accordance with DDTCM 4140 . 2 , Appendix E-930-P <br /> (please see Enclosure 4) . <br /> D . Schedule of final closure (milestone chart) : <br /> 1 . Final date waste accepted : <br /> Since the new collection system cannot be constructed <br /> until the existing tank is removed , collection will <br /> continue until physical removal of the tank is <br /> accomplished . <br /> 2 . Date for completion of inventory disposal : <br /> a . Date of reprocesisng completed : <br /> Not applicable . No reprocessing has or will be performed . <br /> b . Date all on-site disposal completed : <br /> Not applicable . No on-site disposal will take place . <br /> C . Date that all inventory has been disposed on-site : <br /> Not applicable . No on-site disposal will take place . <br /> d . Date that all inventory will be removed off-site : <br /> December 1987 at the latest . <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.