My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:33:59 AM
Creation date
5/29/2019 11:23:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MA005-86-B-0008 <br /> PAGE 13 OF 69 <br /> 2-09. TANK RZT:C-'AL: The Contractor shall meet all requirements of the San <br /> Joaquin County Local Health District. The Contractor shall: Obtain <br /> all tank removal permits (permit fees will be paid by the Government); <br /> Coordinate with the preceding office for the on-site inspection fees. <br /> County inspector and testing laboratory representative must be present <br /> before each and every tank is removed from t. e pit. Removing more than <br /> one tar per site visit by the inspector maybe arranzed between the Con- <br /> tractor and the County inspector and testing laboratory representative. <br /> 2-09.1. Removal of Tanks Liquid Contents (Residuals): Existing, tank liquid <br /> contents shall be pumped out by the Contractor and the Government will <br /> provide the containers. Filled containers shall be delivered to Bldg <br /> 237 by the Contractor. A 2" air space shall be provided between the <br /> drum rim and liquid level. <br /> 2-04' <br />
The URL can be used to link to this page
Your browser does not support the video tag.