Laserfiche WebLink
DLA005-86-B-0008 <br /> PAGE 17 of 69 <br /> SA TLING FRCCEDURES: <br /> 1. As soon as tank is lifted, dig out 3 feet deep of sub:rrade soil as shown. <br /> 2. Take spade-full of soil sample. <br /> 3. If sampling is not practical with a spade, sample can be taken with a <br /> backhoe with spade collection from the backhoe bucket. <br /> 4. All sanplinr must meet the Environmental Protection Agencies "SAIMPLING <br /> =- CDOLXY" for the particular analysis that is to be tested for. <br /> GP.CUtiD LE7EL <br /> TZ1, <br /> S'i'":RADE <br /> t �. , <br /> A <br /> \ I . <br /> \\ 3 \ <br /> \ <br /> PADS-FULL SOIL SAMPLE <br /> FI7URE - 1 <br /> S'!r::RADE SCIL SA!., <br /> 3-03 <br />