My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:33:59 AM
Creation date
5/29/2019 11:23:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+5106388404 ACC FNU1F1-)NMFNTRL 655 PBS SUN 28 '99 161:22 <br /> Electrical Substation ACC project No. 99.6006-MA0 <br /> DD1C Tracy Size, California page 2 <br /> 3.1 Soil Borings <br /> An excavation permit will be obtained from the PHS-EHD before drilling and sampling activities. <br /> The locations of the proposed borings will be marked with white paint. Underground Service Alert <br /> will be notified at least 48 hours before commencing work. <br /> To further evaluate soil conditions, four borings will be drilled using a hydraulically driven <br /> GeoprobcP sampling tool equipped with 1.5-inch, inside diameter, clear, acetate liners. One grab <br /> groundwater sample, if groundwater is encountered, and requested soil samples will be collected <br /> from each sampling location. Proposed boring locations are illustrated on Figure 3. Actual boring <br /> locations may vary slightly based on field observations, safety, utilities, or unknown physical <br /> constraints. <br /> The sampling probe and rods will be prep-leaned prior to use and between sample drives by washing <br /> them with a trisodium phosphate and potable water solution, a potable water rinse, and distilled <br /> water rinse. <br /> Subsurface soil samples will be obtained by drilling to the approximate desired sampling depth, <br /> removing the center rod and drilling point,and driving the sampler 24 inches ahead into undisturbed <br /> material. In four representative borings, soil samples will be collected to a total depth of <br /> approximately 4 to 5 feet bgs. Upon removal from the sampler, each recovered soil sample will he <br /> inspected visually and logged. Samples will be selected for analysis, labeled, and stored in a pre- <br /> chilled, insulated container to be transported following chain of custody protocol to a state-certified <br /> analytical laboratory. <br /> Drilling will be performed under the observation of a Registered Geologist, and the subsurface <br /> materials in the borings will be identified and logged using visual and manual methods. Soil cuttings <br /> will be logged and classified during drilling operations according to the Unified Sol] Classification <br /> System. The boring investigation will be conducted in one day. <br /> All Soil samples will be analyzed for California Title 22 Mals lead, chromium, arsenic, and <br /> cadmium by BPA Method 6010 and 7400 series, fuel fingerprint by EPA Method 8015 Modified, <br /> volatile organic compounds(VOCs)by EPA Method 8260, sernivolatile organic compounds by EPA <br /> Method 8270, and polyehlorinatedbiphenyls(PCBs)by EPA Method 8080 Modified. The estimated <br /> turnaround time for sample results is 10 to 14 days. 11PA quality assuracelquality control Level TV <br /> will be used in accordance with the Army Corps of Engineers' request. <br /> Following drilling and sample collection,each boring location will be abandoned with neat cement to <br /> just below the surface (1 to 2 inches). The surface of each boring location will be completed with <br /> concrete, asphalt,or soil to grade to match the surrounding material. <br />
The URL can be used to link to this page
Your browser does not support the video tag.