My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:33:59 AM
Creation date
5/29/2019 11:23:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> 3.0 WELL SPECIFICATIONS <br /> Each of the nine monitoring wells are to be installed using the guidelines set forth in the Comprehensive <br /> Field Work Plan(Radian International, 1998).The well design specifications of the proposed nine <br /> monitoring wells are shown in Tables 3-1. <br /> Table 3-1 Estimated WeB Specifications* <br /> Estimated Casing Casing Estimated Well Estimated <br /> Boring ID Length Depth Diameter Material Slot Size Screen Well <br /> n <br /> LM153A 60 6-inch SCH 40 PVC 0.010 20 feet <br /> LM154B 100 6-inch SCH 40 PVC 0.010 10 feet <br /> LM155A 60 6-inch SCH 40 PVC 0.010 25 feet <br /> LM156B 100 6-inch SCH 40 PVC 0.010 15 feet <br /> LM157A 60 6-inch SCH 40 PVC 0.010 25 feet <br /> L.M159A 50 6-inch SCH 40 PVC 0.010 25 feet <br /> LM159B 100 6-inch SCH 40 PVC 0.010 10 feet <br /> LM160A 50 6-inch SCH 40 PVC0.010 25 feet <br /> LM 161B 100 6-inch I SCH 40 PVC 1 0.010 15 feet <br /> * Well specifications are dependent upon the lithology encountered during drilling <br /> 4.0 WELL MATERIALS <br /> 4.1 Well Casing <br /> The well casing will be 6-inch nominal diameter Schedule 40 PVC pipe with flush threads for the <br /> monitoring wells.The casing surface will be free of solvents, oils,grease,paint, and dirt and will be <br /> certified clean from the factory or steam-cleaned on site prior to installation. Sections of casing will be <br /> received from the supplier wrapped in polyethylene protective wrappers with sealed ends in order to limit <br /> exposure to potential contaminants. Casing will not be removed from the wrapping until immediately <br /> before it is to be placed in the boring. <br /> 4.2 Well Screen <br /> The well screen will be 6-inch nominal diameter,Schedule 40 PVC slot screen with flush threads for all the <br /> monitoring wells.All screen openings will widen inward so as to be non-clogging.The slot size will be <br /> compatible with the filter pack that will surround the screen;slot size and filter pack will be determined <br /> based on pilot boring lithologies. The well screen will be of sufficient size and design to hold back and <br /> support the filter pack and in-situ soils surrounding the screen.The well screen surface will be free of <br /> solvents,oils,grease,paint,and dirt and will be certified clean from the factory or steam-cleaned on site <br /> prior to installation.The well screen will have smooth,sharp-edged openings free of burrs,chipped edges, <br /> or broken pieces on the interior and exterior surfaces of the pipe. Sections of the screen will be received <br /> from the supplier wrapped in polyethylene protective wrappers with sealed ends in order to limit exposure <br /> to potential contaminants.Wrapping will not be removed until screen is to be used. <br /> 4.3 Filter Pack <br /> The filter pack material will be composed of round,hard, water-worn siliceous sand,free of flat or <br /> elongated pieces, organic matter, or other foreign matter.All filter pack material will be protected from <br /> contamination prior to placement by either storing it in plastic-lined paper bags or in a location protected <br /> from the weather and contamination on plastic sheeting. All filter pack will be placed in the annular space <br /> in the borehole by using a 2-inch tremie pipe. Once the filter pack is in place the driller will develop the <br /> interval until the no measurable decline in the filter pack is measured. All water used placed into the <br /> borehole during the construction process will be accounted for and removed before the well is developed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.