Laserfiche WebLink
EXPLANATION <br /> Monitoring Well with Second Quarter 2015 <br /> Groundwater Elevation (NAVD 88) <br /> 3.56• Crossroads WWTF Network <br /> 5.74 CTF Network <br /> Groundwater Elevation <br /> Contour, in ft. (NAVD 88) <br /> Inferred Groundwater <br /> 00 <br /> Flow Direction 0 750 1, <br /> I i i I i i I <br /> 0 Land Application Site Feet <br /> 0 Storage Pond <br /> KMW-6 <br /> "rcYP 5.31 KMW-9 <br /> �y ,... KMW-8 /� • 5.14 <br /> 1 4.97 / <br /> KMW-2 • O LAS-3 <br /> 3.80 Nt <br /> \ X y tea. <br /> KMW-3 • KMW-4 " a <br /> 4.29 LAS-2 5.47- <br /> • MBRMW-4 <br /> Nest/e 0��(ay 5.46 <br /> KMW_ ,\IkoI? Pond <br /> 3.56 \ j - Gr S5,' <br /> LAS 1 <br /> ( % d` i> anMBRMW-1 Consolidated Treatment <br /> i �d 6.01 <br /> annd Facility <br /> 2.90 ' p ��• `v S4 /,'-MBRMW-2 <br /> Pon �, 5.74 <br /> n () % nd C MBRMW-3 <br /> B 5.04 <br /> ' W-2 "" Crossroads Wastewater <br /> W 1 r 4J1. .-' Treatment Facility <br /> 3.77 <br /> Water levels in Crossroads WWTF <br /> Source: HydroFocus, Inc. City of Lathrop Second Quarter 2015 network wells and in CTF network <br /> Groundwater Monitoring Report, Crossroads Wastewater Treatment wells were measured by FGL <br /> Facility Order No.5-01-251. July 31, 2015. Environmental on 4/27/2015. <br /> Groundwater Elevation Contours, Second Quarter 2015, Figure <br /> HYDROFOCUS1 Crossroads Wastewater Treatment Facility. 2 <br /> PROJECT: 5069 DATE: 9/30/2015 <br />