My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISTOPHER
>
18800
>
2900 - Site Mitigation Program
>
PR0523929
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 10:47:55 AM
Creation date
5/30/2019 10:22:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0523929
PE
2965
FACILITY_ID
FA0016100
FACILITY_NAME
WRP #1/ CITY OF LATHROP
STREET_NUMBER
18800
STREET_NAME
CHRISTOPHER
STREET_TYPE
WAY
City
LATHROP
Zip
95330
APN
19813035
CURRENT_STATUS
01
SITE_LOCATION
18800 CHRISTOPHER WAY
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adrienne Ellsaesser [EH] <br /> From: Zac Crawford <zcrawford@engeo.com> <br /> Sent: Monday, June 20, 20119:03 AM b <br /> To: Mike Infurna [EH];Adrienne Ellsaesser [EH] <br /> Su Jim Klilling ins �n �1pryRo1 v <br /> Subject: RE: drilling inspection coverage <br /> Attachments: Revised Permit for Precision Sampling.pdf <br /> Mike and Adrienne, <br /> The Reclamation District 17 Board of Directors has selected a contractor to install the piezometers that we had been <br /> discussing and permitted earlier this year prior to the project going to bid. Precision Sampling will be performing the <br /> work. At this point I need to modify the permit to change the contractor from V&W Drilling to Precision and schedule an <br /> inspection. Per my discussion with Adrienne, attached is the revised permit and new LCD form. We are currently <br /> scheduled to begin installing the piezometers on July 11`". I anticipate that it will take approximately 5 days to complete <br /> our scope. As discussed, I would prefer to have Mike perform the inspection, as he has the most familiarity with the <br /> project; however, as usual I anticipate that scheduling will be the driving force. Please let me know as soon as possible if <br /> there are any problems with our permit or schedule. <br /> f ' <br /> Zac Crawford �1 n v �IVli,t J( <br /> ENGEO {V wI I <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Thursday, March 24, 20117:47 AM / q <br /> To: Zac Crawford <br /> Subject: RE: drilling inspection coverage <br /> thank you... \ �Iii1 <br /> if you can, get back to me close to end of April 2011. Vaca] <br /> push this field work off to another inspector. <br /> From: Zac Crawford [mailto:zcrawford@engeo.com] <br /> Sent: Thursday, March 24, 20118:36 AM <br /> To: Mike Infurna [EH] <br /> Subject: RE: drilling inspection coverage <br /> Good morning Mike, <br /> Sorry for not getting back to you sooner, I've been out of the office for a while. We are being required to send the <br /> project out to bid, so we have been preparing plans and bid documents. At this point I would estimate that we <br /> would be trying to start work in 5 to 6 weeks, but the way this project has been going who knows. You will be one <br /> of my first calls as soon as I know anything more concrete. <br /> Thanks, <br /> Zac Crawford <br /> ENGEO <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.