My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISTOPHER
>
18800
>
2900 - Site Mitigation Program
>
PR0523929
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 10:47:55 AM
Creation date
5/30/2019 10:22:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0523929
PE
2965
FACILITY_ID
FA0016100
FACILITY_NAME
WRP #1/ CITY OF LATHROP
STREET_NUMBER
18800
STREET_NAME
CHRISTOPHER
STREET_TYPE
WAY
City
LATHROP
Zip
95330
APN
19813035
CURRENT_STATUS
01
SITE_LOCATION
18800 CHRISTOPHER WAY
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adk Page I of 3 <br /> 40 <br /> Mike Infurna [EH] <br /> To: Zac Crawford <br /> Subject: RE: MWM-24 <br /> I got a chance to look at this latest sketch. <br /> please add/modify the following: <br /> 1- footnote 3 to include /'sonotube'. <br /> 2- "no glue" and "PVC" notes to be added at 4" slip x slip coupling where new <br /> PVC extention added to existing PVC casing. <br /> 3- "locking water tight cap" note to be added at well casing top/under locking well <br /> cover and actually add it at end of field work. <br /> 4- call out "new 4" PVC casing extension" for material above 4" slip x slip coupling <br /> or add/draw arrow from note on your drawing where the locking well cover is <br /> printed. <br /> 5- provide concrete apron THICKNESS in inches please. typical is 4". <br /> 6- no doubt/may be about it, EHD WILL be required to inspect hole prior to <br /> RCP/Sonotube AND grout placement. <br /> thanks. <br /> From: Zac Crawford [mailto:zcrawford@engeo.com] <br /> Sent: Monday, March 01, 2010 2:08 PM <br /> To: Mike Infurna [EH] <br /> Subject: RE: MWM-24 <br /> Good afternoon Mike, <br /> I just wanted to let you know that I am still working on getting you a third party billing form. I think we are <br /> going to have you bill Reclamation District No. 17 directly. Hopefully in the next few days I will get the <br /> signed form back from them and I will submit the form and the $345 payment. In the mean time, I have <br /> revised the well modification detail. Please take a look at the attached detail and let me know if is alright. <br /> It should be exactly what we discussed (no more RCP). <br /> Thanks! <br /> Zac Crawford <br /> ENGEO <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Friday, February 05, 2010 2:44 PM <br /> To: Zac Crawford <br /> Subject: RE: MWM-24 <br /> YES, to all those things... <br /> 3/1/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.