Laserfiche WebLink
Adk Page I of 3 <br /> 40 <br /> Mike Infurna [EH] <br /> To: Zac Crawford <br /> Subject: RE: MWM-24 <br /> I got a chance to look at this latest sketch. <br /> please add/modify the following: <br /> 1- footnote 3 to include /'sonotube'. <br /> 2- "no glue" and "PVC" notes to be added at 4" slip x slip coupling where new <br /> PVC extention added to existing PVC casing. <br /> 3- "locking water tight cap" note to be added at well casing top/under locking well <br /> cover and actually add it at end of field work. <br /> 4- call out "new 4" PVC casing extension" for material above 4" slip x slip coupling <br /> or add/draw arrow from note on your drawing where the locking well cover is <br /> printed. <br /> 5- provide concrete apron THICKNESS in inches please. typical is 4". <br /> 6- no doubt/may be about it, EHD WILL be required to inspect hole prior to <br /> RCP/Sonotube AND grout placement. <br /> thanks. <br /> From: Zac Crawford [mailto:zcrawford@engeo.com] <br /> Sent: Monday, March 01, 2010 2:08 PM <br /> To: Mike Infurna [EH] <br /> Subject: RE: MWM-24 <br /> Good afternoon Mike, <br /> I just wanted to let you know that I am still working on getting you a third party billing form. I think we are <br /> going to have you bill Reclamation District No. 17 directly. Hopefully in the next few days I will get the <br /> signed form back from them and I will submit the form and the $345 payment. In the mean time, I have <br /> revised the well modification detail. Please take a look at the attached detail and let me know if is alright. <br /> It should be exactly what we discussed (no more RCP). <br /> Thanks! <br /> Zac Crawford <br /> ENGEO <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Friday, February 05, 2010 2:44 PM <br /> To: Zac Crawford <br /> Subject: RE: MWM-24 <br /> YES, to all those things... <br /> 3/1/2010 <br />