Laserfiche WebLink
0 0 <br /> MONITORING AND REPORTING PROGRAM NO. 5-01-251 4 <br /> CITY OF LATHROP AND CROSSROADS CREA LLC <br /> WASTEWATER TREATMENT FACILITY NO. I (CROSSROADS) <br /> SAN JOAQUIN COUNTY <br /> 3. If requested by staff, copies of laboratory analytical report(s). <br /> B. Quarterly Monitoring Reports <br /> The Discharger shall establish a quarterly sampling schedule for groundwater monitoring such that <br /> samples are obtained approximately every three months. Quarterly monitoring reports shall be <br /> submitted to the Board by the 15` day of the second month after the quarter(i.e. the January- <br /> March quarterly report is due by May 15) and may be combined with the monthly report. The <br /> Quarterly Report shall include the following: <br /> 1. Results of groundwater monitoring; <br /> 2. A narrative description of all preparatory,monitoring, sampling, and analytical testing <br /> activities for the groundwater monitoring. The narrative shall be sufficiently detailed to verify <br /> compliance with the WDR, this MRP, and the Standard Provisions and Reporting <br /> Requirements. The narrative shall be supported by field logs for each well documenting depth <br /> to groundwater; parameters measured before, during, and after purging; method of purging; <br /> calculation of casing volume; and total volume of water purged; <br /> 3. Calculation of groundwater elevations, an assessment of groundwater flow direction and <br /> gradient on the date of measurement, comparison of previous flow direction and gradient data, <br /> and discussion of seasonal trends if any; <br /> 4. A narrative discussion of the analytical results for all groundwater locations monitored <br /> including spatial and temporal tends,with reference to summary data tables, graphs, and <br /> appended analytical reports (as applicable); <br /> 5. A comparison of monitoring data to the groundwater limitations and an explanation of any <br /> violation of those requirements; <br /> 6. Summary data tables of historical and current water table elevations and analytical results; <br /> 7. A scaled map showing relevant structures and features of the facility,the locations of <br /> monitoring wells and any other sampling stations, and groundwater elevation contours <br /> referenced to mean sea level datum; <br /> 8. Copies of laboratory analytical report(s) for groundwater monitoring. <br /> C. Annual Report <br /> An Annual Report shall be prepared as the fourth quarter monitoring report. The Annual Report <br /> will include all monitoring data required in the monthly/quarterly schedule. The Annual Report <br /> shall be submitted to the Regional Board by 1 February each year. In addition to the data <br /> normally presented,the.Annual Report shall include the following: <br /> 1. The contents of the regular groundwater monitoring report for the last sampling event of the <br /> year; <br /> 2. If requested by staff,tabular and graphical summaries of all data collected during the year; <br />