My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISTOPHER
>
18800
>
2900 - Site Mitigation Program
>
PR0523929
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 10:33:58 AM
Creation date
5/30/2019 10:24:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523929
PE
2965
FACILITY_ID
FA0016100
FACILITY_NAME
WRP #1/ CITY OF LATHROP
STREET_NUMBER
18800
STREET_NAME
CHRISTOPHER
STREET_TYPE
WAY
City
LATHROP
Zip
95330
APN
19813035
CURRENT_STATUS
01
SITE_LOCATION
18800 CHRISTOPHER WAY
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WDR Order No. R5-2006-009(P - 2 - Vnitoring Well Requirements <br /> ' D. Well Development (not to be performed until at least 48 hours after sanitary seal placement): <br /> ' Method of development to be used (i.e., surge, bail, pump, etc.) <br /> Parameters to be monitored during development and record keeping technique <br /> Method of determining when development is complete <br /> Disposal of development water <br /> E. Well Survey (precision of vertical survey data shall be at least 0.01 foot): <br /> ' Identify the Licensed Land Surveyor or Civil Engineer that will perform the survey <br /> Datum for survey measurements <br /> List well features to be surveyed (i.e. top of casing, horizontal and vertical coordinates, <br /> ' etc.) <br /> F. Schedule for Completion of Work <br /> ' G. Appendix: Groundwater Sampling and Analysis Plan (SAP) <br /> The Groundwater SAP shall be included as an appendix to the workplan, and shall be <br /> ' utilized as a guidance document that is referred to by individuals responsible for <br /> conducting groundwater monitoring and sampling activities. <br /> Provide a detailed written description of standard operating procedures for the following: <br /> Equipment to be used during sampling <br /> - Equipment decontamination procedures <br /> ' - Water level measurement procedures <br /> Well purging (include a discussion of procedures to follow if three casing volumes <br /> cannot be purged) <br /> ' - Monitoring and record keeping during water level measurement and well purging <br /> (include copies of record keeping logs to be used) <br /> - Purge water disposal <br /> ' - Analytical methods and required reporting limits <br /> Sample containers and preservatives <br /> - Sampling <br /> o General sampling techniques <br /> o Record keeping during sampling (include copies of record keeping logs to be <br /> used) <br /> ' o QA/QC samples <br /> - Chain of Custody <br /> ' - Sample handling and transport <br /> SECTION 2 - Monitoring Well Installation Report <br /> ' The monitoring well installation report must provide the information listed below. In addition, the <br /> report must also clearly identify, describe, and justify any deviations from the approved workplan. <br /> ' A. General Information: <br /> Purpose of the well installation project <br /> Brief description of local geologic and hydrogeologic conditions encountered during <br /> ' installation of the wells <br /> Number of monitoring wells installed and copies of County Well Construction Permits <br /> Topographic map showing facility location, roads, surface water bodies <br /> CADuvoincnr,unJ Sc„iog,rAninrlinAD,A,,AW FBTFMP 0.5-200fi049JfW F_,lac <br />
The URL can be used to link to this page
Your browser does not support the video tag.