My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISTOPHER
>
18800
>
2900 - Site Mitigation Program
>
PR0523929
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 10:33:58 AM
Creation date
5/30/2019 10:24:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523929
PE
2965
FACILITY_ID
FA0016100
FACILITY_NAME
WRP #1/ CITY OF LATHROP
STREET_NUMBER
18800
STREET_NAME
CHRISTOPHER
STREET_TYPE
WAY
City
LATHROP
Zip
95330
APN
19813035
CURRENT_STATUS
01
SITE_LOCATION
18800 CHRISTOPHER WAY
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Reporting <br /> The WDRs require the Discharger to submit this document, the Master <br /> Groundwater Well Installation and/or Destruction Workplan prior to the first <br /> scheduled construction or destruction of any groundwater monitoring well. A <br /> Groundwater Well Project Description Addendum is also required prior to well <br /> construction or destruction. The Well Project Description Addendums shall <br /> ' provide site specific information and refer to the well construction and <br /> abandonment procedures specified in this Master Well Workplan. <br /> ' Within 90 days of obtaining approval of a Groundwater Well Project Description <br /> Addendum, the Discharger shall submit a Well Installation/Destruction Report to <br /> the Regional Water Quality Control Board and Director of the San Joaquin <br /> County Environmental Health Department (or the Director's designee). Well <br /> installation shall document the construction activities and include maps showing <br /> as-built well location and well construction diagrams. The boring logs, well <br /> 1 development records, and measurement point elevations shall be provided in the <br /> report, and any deviations from the Groundwater Well Project Description <br /> Addendum identified and explained. <br /> ' Additionally, separate monitoring well construction, alteration, or destruction <br /> reports shall also be prepared and filed with the California Department of Water <br /> ' Resources as required by the California Water Code. <br /> H. Schedule for Completion of Work <br /> The WDRs require that 120-days prior to the first scheduled construction or <br /> destruction of any groundwater monitoring well, the Discharger shall submit a <br /> Groundwater Well Project Description Addendum. The Well Project Description <br /> Addendums shall provide site specific information and refer to the well <br /> construction methods specified in this Master Well Workplan. <br /> The first Groundwater Well Project Description Addendum is planned for <br /> submittal on approximately May 1, 2007. Subsequent to approval of the Master <br /> Well Workplan and Project Description Addendum, the first scheduled <br /> ' construction activities are tentatively anticipated to start around the beginning of <br /> August 2006 (more than 160 days after submittal of the Master Well Workplan). <br /> By October 2007, the August construction activities are tentatively planned to be <br /> ' completed and the Well Installation Report submitted to the RWQCB. <br /> Subsequent well construction or destruction activities shall be preceded by <br /> ' additional Groundwater Well Project Description Addendums submitted 120 days <br /> prior to the scheduled construction. <br /> ' - 9 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.