Laserfiche WebLink
EXPLANATION <br /> Monitoring Well with 2nd Quarter 2010 <br /> Groundwater Elevation (NAVD 88) <br /> 5.92• Crossroads WWTF Network <br /> 7.53 <br /> U WRP-1 MBR Network <br /> Groundwater Elevation <br /> Contour, in ft. (NAVD 88) <br /> Approximate Groundwater <br /> Flow Direction 0 750 1,500 <br /> ELI Land Application Site Feet <br /> 0 = Storage Pond <br /> 'IrcY Pk�VY CA <br /> O 10.17 <br /> 10.0 tea. <br /> LAS-3 a <br /> 5.92 9. s' <br /> 7.97 -Z�� <br /> 6.11 8 0 <br /> Nest/e wa 7.20 <br /> 8.53 <br /> a <br /> 5.820 LAS-2 <br /> \5�op WRP-1 MBR Water <br /> 7.53 Pond Recycling Plant <br /> 7.33 S5 <br /> and <br /> Pond <br /> 5.12 A S4 7.15 <br /> 60 Pond C9 <br /> on 9 <br /> 9.06 9.90 <br /> Crossroads Wastewater <br /> Treatment Facility <br /> 120 <br /> Water levels in Crossroads WWTF network wells were measured by FGL <br /> Environmental on 5/3/2010. Water levels in WRP-1 MBR network wells <br /> were measured by Hydro Focus on 4/21/2010. <br /> USu Groundwater Elevation Contours, 2nd Quarter 2010, Figure <br /> �IYaR�FOC <br /> Ctt- rossroads Wastewater Treatment Facility. 3 <br /> PROJECT: 5040 DATE: 5/28/10 <br />