Laserfiche WebLink
f <br /> 1. INTRODUCTION <br /> A.' SITE LOCATION: Newark Sierra Paperboard Mill 800 W Church St. Stockton, CA. 95203 <br /> i <br /> i <br /> B. PLAN PREPARED: lanuary 27, 1988 <br /> Name Date <br /> C. PLAN APPROVED: lanuary 27, 1988 <br /> Project Mana er Date <br /> Tanuary 29, 1998 <br /> 'fiHSO Date <br /> D. PLAN REVISED: <br /> Name Date <br /> E. REVISION APPROVED: <br /> Project Manager Date <br /> DHSO Date <br /> F. THE POSSIBLE HAZARDS ON THIS JOB ARE EXPECTED TO BE: Chemicals in the the soil <br /> i' and groundwater,mechanical hazards associated with drilling,electrical hazards associated with <br /> buried utilities temperature hazards associated with drilling and sampling. <br /> G. REQUIRED PERSONAL PROTECTIVE ITEMS AND EQUIPMENT FOR THIS PROJECT:Level D <br /> PPE requirements: steel toed boots safety glasses hard hat, foam ear plugs, and orange safety <br /> vest at all times Nitrile gloves required during sampling operations. <br /> J4572.doc 1 <br />