Laserfiche WebLink
GeOSsyn��� z START DATE 11/20/2012 8:00:00 AM SHEET 2 OF 2 <br /> 1. 1111 Broadway.6th FI FINISH DATE 11/20/2012 9:45:00 AM <br /> Oakland,CA 94607 <br /> Tel:(510)836-3034 PROJECT Dopaco <br /> GOnSUlt=tS Fax:(510)836-3036 LOCATION 800 W Church St,Stockton,CA <br /> PROJECT NUMBER WR1194 Elevation 5.81 FT.MSL <br /> FORM: <br /> CORE3 10/00 LOG OF DMW-3 <br /> SAMPLES <br /> C7 <br /> o <br /> DEPTH MATERIAL 2 1 D } z TIME COMMENTS <br /> (ft) DESCRIPTION m w Construction ell a > 6 n <br /> SOIL NAME(USCS SYMBOL):Color, 3 Material <br /> Moisture,Grain Size and Percents e y m W <br /> Plastict� Consistency/Density Other�Odor, o <br /> Dry Strength,6Aineral Content) <br /> 5 GY 4/2),wet,50%medium sand,30%fine sand,20% <br /> non-plastic fines,loose. <br /> 0.0 09:12 <br /> 35 <br /> SILT(ML):dark grayish green(10 Y-5 GY 4/2),moist,100% <br /> non-plastic fines,stiff. <br /> 40 Total Depth 40 ft bgs <br /> 0 <br /> c7 <br /> U <br /> F <br /> 0 <br /> O <br /> W <br /> 0 <br /> a <br /> C7 <br /> O <br /> U <br /> Q <br /> a <br /> O <br /> O <br /> Z <br /> Z <br /> Y <br /> Q <br /> O <br /> 3 CONTRACTOR Gregg NORTHING 2167555:630 REMARKS:Well screened from 3040 ft bgs.Samples every 5 ft to 25 ft, <br /> 3 EQUIPMENT Marl Mil FASTING 6330008:200 <br /> then continuous to 40 ft. <br /> °o DRILL MTHD Hollow Stem ANGLE Vertical <br /> DIAMETER(in) 8" BEARING <br /> z COORDINATE SYSTEM: NAD83 <br /> o LOGGERTS REVIEWER CK PRINTED 01/15/13 SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS <br /> i m <br />