Laserfiche WebLink
John Yoakum [EH] <br /> From: Tony Smith <TSmith@Geosyntec.com> <br /> Sent: Monday, December 10, 2012 9:22 PM <br /> To: John Yoakum [EH] <br /> Subject: RE:Well permit application <br /> Johnny, <br /> The boring at DMW-2 was terminated at 40 feet and grouted with cement,like the others.A well was not installed at <br /> that location, nor will a well be installed at that location at this time. <br /> Please let me know if you need any additional information. <br /> -Tony <br /> From: John Yoakum [EH] [mailto:]Yoakum(a)sjcehd.com] <br /> Sent: Monday, December 10, 2012 4:08 PM <br /> To: Anthony Smith <br /> Subject: RE: Well permit application <br /> Tony, <br /> Sorry I lost track of your project. <br /> The last time I saw you it was November 201h <br /> You had installed dmwl and dmw 4 on the 19tH <br /> On the 201h dmw 3 had been completed and dmw2 was at 40 feet and sampling. <br /> .What happened next? <br /> Were you able to complete it that day? <br /> Johnny Yoakum <br /> From: Tony Smith fmailto:TSmith()Geosyntec.com] <br /> Sent: Thursday, November 15, 2012 8:34 AM <br /> To: John Yoakum [EH] <br /> Subject: RE: Well permit application <br /> Johnny, <br /> The well installation at the Dopaco Area of 800 W Church St will begin on Monday, 19.November at lam. I will be in the <br /> field and can be reached at 512-653-1570. <br /> Tony Smith <br /> Senior Staff Engineer, Geosyntec Consultants, Inc. <br /> 1111 Broadway,Ste 600 <br /> Oakland,CA 94607 <br /> Direct:(510)285-2770 <br /> tsmith Pgeosyntec.com <br />