My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2900 - Site Mitigation Program
>
PR0516614
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 3:47:47 PM
Creation date
5/31/2019 3:21:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516614
PE
2960
FACILITY_ID
FA0012708
FACILITY_NAME
NEWARK SIERRA PAPERBOARD/ RECYCLING
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adrienne Ellsaesser [EH] <br /> From: Lopez,Jeana <jeana.lopez@urs.com> <br /> Sent: Friday,June 27, 2014 11:29 AM <br /> To: Adrienne Ellsaesser [EH] <br /> Cc: ssih@sjcehd.com; Elarth,Vernon <br /> Subject: Newark Recycle Plant 800 W.Church St., Stockton Supply Well Destruction Status <br /> Attachments: 05 - Fig 2 - Supply Well Results.pdf,08 -Attach B -Video Log Summary.pdf <br /> Hello Adrienne, <br /> have attached a site figure with supply well locations and first round of analytical results for the 5 supply wells pending <br /> destruction. I have.also attached a summary of the video logs ran back'in March. We can arrange a call to discuss the <br /> images. Let me know when you are available. I have made a copy of the videos for you to review as well. I can snail <br /> mail them to you. <br /> After speaking with Tylor McMillon, the Welenco PM for well destructions via explosives, he doesn't think there is a good <br /> chance he will be able to get a charge passed the blockage at 91' bgs in Well#3. That was the well we tried to pull out the <br /> pump column and failed at 35'with a crane. He mentioned, if the county would allow the demo with obstructions in place, <br /> he would recommend lowering the charge inside the column pipe to ensure destruction of both casings. He also <br /> mentioned, he is not confident the charge would set passed 91' bgs due to the complete.blockage. In that case, what are <br /> our options with Well#3? <br /> Please let me know when you are available to discuss how to proceed. <br /> Thank you, <br /> Jeana <br /> This e-mail and any attachments contain URS Corporation confidential information that may be proprietary or privileged. If you <br /> receive this message in error or are not the intended recipient,you should not.retain,distribute,disclose or use any of this <br /> information and you should destroy the e-mail and any attachments or copies. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.