My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2900 - Site Mitigation Program
>
PR0516614
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 3:47:47 PM
Creation date
5/31/2019 3:21:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516614
PE
2960
FACILITY_ID
FA0012708
FACILITY_NAME
NEWARK SIERRA PAPERBOARD/ RECYCLING
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dopaco, Inc. - - 2 - t 10 July 2012 <br /> 800 W. Church St., Stockton <br /> San Joaquin County <br /> Upon completion of the MIP/CPT investigation, the results and maps of the sample. <br /> locations will be provided in a letter report with location recommendations for a <br /> minimum of four groundwater monitoring wells, and proposed well construction details. <br /> Following regulatory approval of the wells work plan, the 2" diameter polyvinyl chloride <br /> (PVC) wells (DMW-1 through DMW-4) will be installed and screened in first water <br /> (historically 15' bgs to 2.0' bgs). DMW-1 through DMW-4 will be sampled and analyzed <br /> for toluene by USEPA Method 8260B. A final report of the investigation and monitoring <br /> wells installation will be submitted, and further,recommendations will be made for <br /> additional work as warranted. The CPT/MIP investigation (including the letter report) <br /> will be completed within-60 days of the Workplan approval pending subcontractor <br /> availability. A schedule for the wells installation and reporting will be included in the <br /> letter report. <br /> t <br /> The Workplan is conditionally approved with the following additions: <br /> e <br /> • Grab groundwater sample analyses for USEPA Method 8260B will report all peaks, <br /> including toluene, in the data provided in the reports. _ <br /> • Status reports, submitted to me at the email address below, are due on the 30th day <br /> of each month until completion of the approved work, and shall include any <br /> changes to the proposed schedule or other problems associated with the fieldwork. <br /> The first status report.is due 30 July 2012. _ <br /> . y. <br /> • The letter report/work plan is due 15 September 2012.. <br /> Please give the San Joaquin County Environmental Health Department and•myself at <br /> least 3 working days' notice prior to initiating fieldwork. You may contact me with <br /> questions by phone at (916),464-4615 or by email at ibarton(a7waterboards.ca.gov. <br />+, aures L. L. Barton, P-G. <br /> :Engineering.Geologist—,-- <br /> UST <br /> eologist--,UST Program 4 <br /> cc: see attached list of interested parties ,. <br /> i <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.