My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
639
>
3500 - Local Oversight Program
>
PR0544513
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 4:42:10 PM
Creation date
5/31/2019 4:38:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0544513
PE
3528
FACILITY_ID
FA0024115
FACILITY_NAME
WEST CLAY PROPERTY
STREET_NUMBER
639
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95209
APN
14707110
CURRENT_STATUS
02
SITE_LOCATION
639 W CLAY ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 February 2015 <br /> AGE-NC Project No. 96-0235 <br /> Page 6 of 10 <br /> 3.6. GROUNDWATER SAMPLING AND ANALYSIS <br /> �n <br /> Following the installation of the new monitoring wells, groundwater m itoring and <br /> sampling activities will be conducted at the wells on a quarterly basis fora minimum of <br /> one year (four sampling events); monitoring activities will include recording depth to <br /> groundwater measurements and collection of groundwater samples for Ja&oratory ,. <br /> analysis by a CDPH-ceXtified laboratory for the analytes noted in Section 3.3.1' 4ip�,�j?�►�� ' <br /> 3.7. PREPARATION OF REPORT OF FINDINGS <br /> A report documenting the findings of the soil borings, well installations, development <br /> and survey will be prepared following performance of field work and receipt of all <br /> applicable data. Additionally, quarterly reports will be prepared following each <br /> groundwater monitoring event. Each report will include a description of work performed <br /> and the results of the groundwater sampling and analysis. Conclusions and <br /> recommendations will also be included, if applicable for each report. All reports will be in <br /> a format acceptable to the SJCEHD and the CVRWQCB, and will be reviewed and <br /> signed by a California Professional Geologist. <br /> 4.0. FIELD PROCEDURES <br /> All field procedures will be overseen by an AGE representative under the supervision of <br /> a California Professional Geologist. Procedures for probe boring advancement, grab <br /> groundwater sampling, boring abandonment, equipment decontamination and sample <br /> handling, pilot soil boring advancement, well installation, well development, well survey <br /> and well sampling are described below. <br /> 4.1. SOIL PROBE BORING ADVANCEMENT <br /> w Proposed soil borings will be advanced using a truck mounted AMS Powerprobe 9600 <br /> or Geoprobe 5400 direct-push probing unit equipped with 1.25-inch probing rods. The <br /> Powerprobe or other probe advances soil probe borings using a hydraulic hammer to <br /> drive a groundwater sampling tools to specified depths. <br /> 4.1.1. Soil Sampling <br /> If the SJCEHD requires collection of soil sam le gtoil samples will be collected at <br /> discreet ive-foot interva s e ween and 50 eet bsg using a 1.45 inch diameter <br /> Geoprobe soil sampling assembly loaded with a two-foot acetate liner. Upon sample <br /> retrieval, a selected portion of the liner will be cut and covered with Teflon sheets, <br /> capped and sealed with tape. <br /> Advanced GeoEnvironmental Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.