Laserfiche WebLink
West Clay Properties -2- _ May 28, 2008 <br /> Claim No. 8542 <br /> B. Monitoring Well Information <br /> Well Designation Date Installed Screen Interval Most Recent DTW <br /> _ feet b s Jan 08 <br /> MW-1 May 01 40-60 18.86 <br /> MW-2 May 01 40-60 18.26 <br /> MW-3 May 01 30-50 17.48 <br /> MW-4 May 01 13-33 - <br /> MW-5 May 01 15-35 18.71 <br /> MW-7 May 01 10-30 17.80 <br /> MW-8a May 01 10-30 17.81 <br /> MW-8b May 01 40-45 17.48 <br /> MW-9 May 01 40-45 16.73 <br /> MW-10 May 01 10-30 17.05 <br /> MW-11 a May 01 10-30 16.10 <br /> MW-11 b May 01 40-45 16.91 <br /> MW-12a ay 01 10-30 16.00 <br /> MW-12b May 01 40-45 16.71 <br /> MW-13a ay 01 10-30 16.95 <br /> MW-13b May 01 40-45 17.40 <br /> MW-16 May 01 75-85 16.80 <br /> MW-17 May 01 95-105 16.88 <br /> MW-18 May 01 75-85 18.60 <br /> MW-19 May 01 95-105 18.91 <br /> MW-20 May 01 95-105 18.15 <br /> MW-21 May 01 75-85 18.10 <br /> MW-22 May 01 135-140 17.79 <br /> MW-23 May 01 135-140 18.06 <br /> MW-24 May 01 134-139 19.29 <br /> MW-25 May 01 20-40 18.12 <br /> MW-26 May 01 20-40 17.47 <br /> • LAND USE DESIGNATION: commercial and residential <br /> • ESTMATED WATER QUALITY OBJECTIVES (WQO'S) FOR SITE: Per the <br /> Water Quality Control Plan (Basin Plan) for the Sacramento River Basin and the <br /> San Joaquin River Basin (Fourth Edition). <br /> California Environmental Protection Agency <br /> C',Recyded Paper <br />