Laserfiche WebLink
Contact for Explosives Valerie Dibley, Facility Manager, <br /> Waste Storage Facility WCI Site 300 Operations <br /> and Explosives Waste Lawrence Livermore National Laboratory, Site 300 <br /> Treatment Facility and P.O. Box 808(L-871) <br /> B-829 Livermore, CA 94551 <br /> (925)422-9777 <br /> Owner: U.S. Department of Energy <br /> Address: National Nuclear Security Administration(NNSA) <br /> Livermore Field Office <br /> P.O. Box 808 (L-293) <br /> Livermore,CA 94551 <br /> NNSA/LFO Contact: Peter Rodrik, Manager <br /> Livermore Field Office <br /> National Nuclear Security Administration(NNSA) <br /> P.O. Box 808 (L-293) <br /> Livermore,CA 94551 <br /> (925)423-4339 <br /> 3.0 PREPAREDNESS AND PREVENTION <br /> 3.1 Facility Design <br /> Site 300 Facilities have been located, designed,and constructed to minimize the risk of <br /> hazardous waste incidents. The location of each Facility at Site 300 is shown on the Site Map <br /> (Figure 1). Facility descriptions, operations. layout, location of emergency equipment,and <br /> evacuation routes for individual Facilities are shown in the Figures included in Appendices I-1, <br /> 1-2,1-3 and I-4. <br /> 3.2 Procedural Controls <br /> Operations at the Facilities are conducted using approved work control documents and within the <br /> framework of the Facility permits. The documents are used as training tools for Facility <br /> operations and are easily accessible to Facility personnel.Each document contains: <br /> • A description of an anticipated activity and its hazards and risks. <br /> • The name of the individual responsible for ensuring compliance with the work control <br /> document. <br /> • Instructions to be followed to implement the controls that will reduce the risks to an <br /> acceptable level. <br /> • Information concerning any special conditions that may be present. <br /> 3.3 Evaluations and Audits <br /> LLNL Site 300 Contingency Plan 10 January 2019 <br />