Laserfiche WebLink
4 r <br /> 10 Apri12001 t ' <br /> AGE-NC Project No 96-0235 <br /> Page 5 of 5 :t <br /> of feasibility studies at both the former UST No 3 and fbimer UST cluster locations The <br /> outlined work should be performed upon approval of the work plan by the PHS-EHD <br /> ` ' • ,Continued quarterly ground water monitoring <br /> 6.0. LIMITATIONS <br /> } <br /> Our professional services were performed using that degree of care and skill ordmarily exercised by <br /> ienvironmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this *investigation was mdde from a limited number of available <br />' subsurface data points (i e ground water samples from ground water monitoring wells) and <br /> subsurface conditions may vary away from these data points No other warranty, expressed or <br />' implied, is made as to the professional recommendations contained in this report <br /> r <br /> r _ <br /> I _ <br /> ' 1 <br /> t <br /> 5 <br /> 1 <br /> Advanced GeoEnvironmentai,Inc <br /> ! <br />