Laserfiche WebLink
} <br /> 1 <br /> 27 April 2003 <br /> AGE-NC Project No 96-0235 <br /> IPage 8 of 8 s <br /> • Continued quarterly ground water monitoring The next quarterly monitoring event should <br />' be scheduled for March 2003 <br /> • A work plan for interim remediation of both the former UST cluster area and the former UST <br />' No 3 area should be prepared <br /> G.O. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory'Evaluation of the hydrogeologlc conditions <br />' at the site for the purpose of this investigation was made from a limited number of available <br /> subsurface data points(I a soil samples,ground water samples from ground water monitoring wells) <br /> and subsurface conditions may vary away from these data points No other warranty, expressed or <br />' Implied,is made as to the professional interpretations,opinions and recommendations contained In <br /> this report <br /> 1 r <br /> S <br /> , 1 <br /> 1 r r <br /> ] I <br /> r I <br /> `3 <br />' Advanced GeoEnvtironmental,Inc <br />