My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLIFTON COURT
>
16500
>
3500 - Local Oversight Program
>
PR0544564
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2019 12:04:47 PM
Creation date
6/14/2019 11:26:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544564
PE
3528
FACILITY_ID
FA0005646
FACILITY_NAME
SARALE FARMS INC
STREET_NUMBER
16500
Direction
W
STREET_NAME
CLIFTON COURT
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
18904011
CURRENT_STATUS
02
SITE_LOCATION
16500 W CLIFTON COURT RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 2012 I . 1 r� '�' 12'0 <br /> AGE-NC Project No. 01-0887 Ure <br /> Page 4 of 5 _ f r� ' `t .r <br /> canister will be attached to the end of the sampling manifold while the sample canisters will " y <br /> P 9 <br /> be attached to the tee-fitting between the PRT and purge container. Teflon® tape will be <br /> placed on the threads of each open fitting of the manifold assembly prior to attaching the <br /> PRT and sampling and purge canisters. <br /> Leak tests will be performed on each assembly by attaching and securing the sample and <br /> purge canisters to the manifold and opening the valves on the purge canister and the / <br /> manifold. The leak test will be performed for approximately 10 minutes on each assembly. <br /> Each soil-vapor boring location will be isolated from ambient air by enclosing the borehole, <br /> tubing and manifold/canister assembly in plastic shroud, which will be weighted at the <br /> surface. Isopropyl alcohol (IPA)as a liquid will be placed in a stainless steel bowl within the <br /> plastic structure and allowed to volatilize into the air enclosed within the plastic structure <br /> surrounding the borehole, tubing and manifold/canister assembly. <br /> The purge volume will be determined by calculating the internal volume of the tubing,vapor <br /> point holder and PRT adapter and the volume of sampling void (created by retracting the <br /> boring rod). <br /> Upon achieving a successful leak test and allowing for 120 minutes of equilibration time, <br /> the purge canister valve will be opened for a calculated period of time to allow the three <br /> calculated volumes of air to be purged. The purge vacuum gauge will be monitored to <br /> ensure a proper decrease of vacuum purged, <br /> Upon achieving the targeted purge volume, the purge canister valve will be closed and the <br /> sample canister valve will be opened. The initial pressure and time will be recorded. Upon <br /> reaching at least -5 in Hg or less, the sample canister valve will be closed and final <br /> pressure and time recorded. The sampling port on the sampling canister will be capped <br /> with a brass end-cap. The samples will be transmitted to a CDPH-certified laboratory under <br /> chain-of-custody by courier. <br /> EQUIPMENT DECONTAMINATION <br /> Prior to use, all sampling tools used for sample collection will be thoroughly rinsed with <br /> clean water after being washed with a solution of Alconox. All probing rods will be cleaned <br /> prior to advancement at each probe boring location. <br /> Advanced CeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.