Laserfiche WebLink
December 2012 I . 1 r� '�' 12'0 <br /> AGE-NC Project No. 01-0887 Ure <br /> Page 4 of 5 _ f r� ' `t .r <br /> canister will be attached to the end of the sampling manifold while the sample canisters will " y <br /> P 9 <br /> be attached to the tee-fitting between the PRT and purge container. Teflon® tape will be <br /> placed on the threads of each open fitting of the manifold assembly prior to attaching the <br /> PRT and sampling and purge canisters. <br /> Leak tests will be performed on each assembly by attaching and securing the sample and <br /> purge canisters to the manifold and opening the valves on the purge canister and the / <br /> manifold. The leak test will be performed for approximately 10 minutes on each assembly. <br /> Each soil-vapor boring location will be isolated from ambient air by enclosing the borehole, <br /> tubing and manifold/canister assembly in plastic shroud, which will be weighted at the <br /> surface. Isopropyl alcohol (IPA)as a liquid will be placed in a stainless steel bowl within the <br /> plastic structure and allowed to volatilize into the air enclosed within the plastic structure <br /> surrounding the borehole, tubing and manifold/canister assembly. <br /> The purge volume will be determined by calculating the internal volume of the tubing,vapor <br /> point holder and PRT adapter and the volume of sampling void (created by retracting the <br /> boring rod). <br /> Upon achieving a successful leak test and allowing for 120 minutes of equilibration time, <br /> the purge canister valve will be opened for a calculated period of time to allow the three <br /> calculated volumes of air to be purged. The purge vacuum gauge will be monitored to <br /> ensure a proper decrease of vacuum purged, <br /> Upon achieving the targeted purge volume, the purge canister valve will be closed and the <br /> sample canister valve will be opened. The initial pressure and time will be recorded. Upon <br /> reaching at least -5 in Hg or less, the sample canister valve will be closed and final <br /> pressure and time recorded. The sampling port on the sampling canister will be capped <br /> with a brass end-cap. The samples will be transmitted to a CDPH-certified laboratory under <br /> chain-of-custody by courier. <br /> EQUIPMENT DECONTAMINATION <br /> Prior to use, all sampling tools used for sample collection will be thoroughly rinsed with <br /> clean water after being washed with a solution of Alconox. All probing rods will be cleaned <br /> prior to advancement at each probe boring location. <br /> Advanced CeoEnvironmental,Inc. <br />