Laserfiche WebLink
^ <br /> i <br /> • ie <br /> - 23 March 2006 - -- Y <br /> _ 887 , } <br /> -Project No. Ul-O t•� _ -_ - <br /> E NG�Pro'e - <br /> Y Page 4 of 5 : - <br /> Following sample collection,each preserved sample sleeve <br /> will.-6e-Labeled with the boring location, <br /> depth,time,-date,and sampler's irutals._Appropriately sealed_an-labeled samples will be placed in .; <br /> –- - . <br /> achilled confaiiierand=trap'sported-under-chairi_ofcusto dy to a-DHS'certified laboratoryfor analysis <br /> for the constituents listed in.Section <br /> = = 3.2:- 'WE _COMPL-ET10N ANI] .WEL-L tEL <br /> LL EVAT10N SURVEY _ <br /> f _ � _ <br /> Pilot borings MW75 through'MW--9-will•be cbmpleted'as ground.Watermonitoring wells utilizing <br /> 2-inch diameter;Schedple 40 polyvinylchloride(PVC)blank well.casing.and 0.020 inclrslotte`d•well- - <br /> r screen installedTrome30 feet to 35°.feet.bsg ori 6orings`MW-S through MW-8 and frotri SS;feet to _ <br /> 60 feet in-boririg.MW-9:Proposed_monitoring w lI construction diagrarns are depicted on Figures,3.T.w <br /> - and=4 h _ = _ :- <br /> - - <br /> - <br /> After_installing the well easing in each p{lot'boring; a_filter pack material consisting of.pre-washed <br /> - #3-Lonestar sand will be_added:through the_augers,frorri_total_depth.to approxiirmit ly-2 feet above <br /> the--screened_interval...Following.placement-of the-filter:pack, the:;well,'will be surged to assist'in } <br /> settling the filter pack::.Additiorial sand will be added if settling occurs A norriiiial 2'-foot lientonxte = - <br /> j - - — +.. +4 - - <br /> chipseal Will be placed above the f lter pack to mimrntze thepotent�al for-grout penetration into the. - <br /> screened section of wells:The bentonite-seal will be=formed I?. ourin`bentorute- -ellets irto ttie <br /> - _ _ Yp g p <br /> annulus and,allowing them to�settle on the filter pack The bentonite wilhbe allowed-to.ltydrate for. <br /> a.minimum 6f/2-hour prior`to grouting Th emaining annular space will be filled to withxna�foot' . <br /> of the ground'surface.with�a:cemerit=grout.__The grout mixture will consisf of Type I/II portil'arid neat <br /> ; — = - - <br /> cement and not more than 3-gallons of_water.per 47:-pourid sack o£=cement.-A grouting.inspection: <br /> f will be'scheduled witli�EHD personnel <br /> Following coriipletion`of the monitoring wells, well elevation"s and locations Will:be.'surveyed by a <br />_ T <br /> Cal ifornia-lrccnsed.surveyor. <br /> 'r <br /> 3.3i-.,- <br /> .WELL DEVELOPMENT-•^ _ <br /> 77- Development_:of-the-proposed wells-will:consist•-ofa combination of bailing with-,a'' stainless steel _ <br /> bailer'to remove the major portion of f ne;grained sedirrientfrom inside the well;sur`ging to-flush <br /> or draw in sediment froXri tkie filter pack,and-additional ground'wate'r evacuation with a:Waterra- . <br /> ineAia'pump to fnislfthe.reirioval."of f,n grained sediment D.eyelopmental purging-activities-will ' <br /> :. .be"continued u til field* aram6ters 14 electrical-conductivi <br /> p {p N,and temperature}have stabilized and <br /> _ pu"rged water Js visually,sediment=free. <br /> Advaxced-GeoEnvironmentsl:Fnc:' <br /> - - _- _ <br /> ,.-- <br />