My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLUFF
>
820
>
2900 - Site Mitigation Program
>
PR0505261
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2019 2:31:42 PM
Creation date
6/14/2019 2:29:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505261
PE
2953
FACILITY_ID
FA0006669
FACILITY_NAME
LODI USD-TRANSPORTATION FAC
STREET_NUMBER
820
Direction
S
STREET_NAME
CLUFF
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04925028
CURRENT_STATUS
02
SITE_LOCATION
820 S CLUFF AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHF Environmental Consukants, Inc. <br /> Health & Safety Plan <br /> Page. 6 <br /> - Thumbs up: OK, I'm all right, I under tand. <br /> - Thumbs down: No, negative. <br /> Site work areas entrance and exit routes will le planned and emergency escape <br /> routes delineated by the Project Manager. Thease routes will be shown to all on- <br /> site personnel by the SSO. <br /> Visual contact will be maintainedbetween " airs" on site with the team remain- <br /> P <br /> ing in close proximity in order to assist each o'1her in case of emergencies. <br /> In the event that any member of the field crew experiences any adverse effects <br /> or symptom of exposure while on-site, the entire field crew should immediately <br /> halt work and act according to the instructions provided by the.PSO. <br /> Wind indicators visible to all on-site personn�i will be provided by the Project. <br /> Manager to indicate possible routes for upwind escape. <br /> The discovery of any condition that would su gest the existence of a situation <br /> more hazardous than anticipated, should res ilt in the evacuation of the field <br /> team and re-evaluation of the hazard and the le 61 of proutction required. <br /> In the event that an accident occurs the PSO I to complete an Accident Report <br /> P po <br /> Form for submittal to the Project Manager, Client Project Coordinator, and <br /> WHF Environmental Consultant's office. <br /> 3.3 General Erst Aide Treatment <br /> Eye Irrigate Immediately✓ <br /> Skin Soap was promptly <br /> Inhalation Move to fresh air <br /> Ingestion Get medical attention <br /> L . <br />
The URL can be used to link to this page
Your browser does not support the video tag.