Laserfiche WebLink
PMER <br /> how <br /> Certification and Management Approval <br /> Professional Engineer Certification - §112.3(d) <br /> This certification is required under 40 CFR 112 "Spill Prevention, Control, and Countermeasure <br /> Plan Regulation" and is applicable to Plant#22 in Tracy, California. <br /> I hereby certify that I have reviewed the Spill Prevention, Control, and Countermeasure Plan <br /> Regulations, and that: <br /> i. I am familiar with the SPCC requirements of 40 CFR 112. <br /> ii. My authorized agent has visited and examined the Plant#22. <br /> iii. This Plan was prepared in accordance with good engineering practices considering <br /> applicable industry standards and the requirements of 40 CFR 112. <br /> iv. Procedures for inspections and testing as required by 40 CFR 112 have been established. <br /> And, <br /> V. This Plan is adequate for the Plant#22 in Tracy, California. <br /> This certification in no way relieves Owens-Brockway of their duty to prepare and fully implement <br /> this Plan in accordance with 40 CFR 112. <br /> Engineer: Karen E. Petryna aP��Fessio <br /> C55126 a <br /> Signature: <br /> 9� CIVIL o�\P <br /> Registration Number: C55126 <br /> State: California <br /> Date: 07-18-19 <br /> GHD I Spill Prevention, Control,and Countermeasure(SPCC)Plan 111189093(1) Page ii <br />