My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COOK
>
0
>
2900 - Site Mitigation Program
>
PR0505378
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:17:21 AM
Creation date
6/18/2019 10:32:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505378
PE
2960
FACILITY_ID
FA0006743
FACILITY_NAME
HOLT LEAK SITE
STREET_NUMBER
0
STREET_NAME
COOK
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
COOK RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control Board A <br /> Central Valley Region <br /> Robert Schneider,Chair Gray Davis <br /> Winston H.Hickox <br /> Secretory for Sacramento Main Office Governor <br /> Environmental Internet Address: http://www.swrcb.ca.gov/--rwgcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000•FAX(916)255-3164 <br /> 9 October 2001 6 0 :111;V c I �010 <br /> Ms. Catherine Quinn <br /> Kinder Morgan Energy Partners <br /> 1100 Town and Country Road <br /> Orange, California 92868 <br /> REVIEW OF WORK PLAN ADDENDUM,KINDER MORGAN ENERGY PARTNERS, <br /> HOLT RELEASE SITE, SAN JOAQUIN COUNTY <br /> We have reviewed the 7 September 2001 Addendum to the Work Plan for Source Area <br /> Characterization (WP Addendum)prepared by C112M Hill on behalf of Kinder Morgan Energy <br /> Partners (KMEP) through its operating partnership SFPP, L.P. for the Holt petroleum release site. <br /> In a 26 September 2001 conference call with you, Mr. Mark Wuttig of CH2M Hill and me, we <br /> further modified the WP Addendum with the following change: The number of sampling <br /> locations shall be reduced from 19 to 10 with soil sampling occurring at locations 2, 5, 6, 8, 10, <br /> 11, 12, 13, HA-2 and HA-6. You verbally requested the reduction in the number of sampling <br /> locations because you felt certain locations were technically redundant. <br /> According to the schedule we discussed during our phone call, the field work will begin the week <br /> of 15 October and preliminary findings presented during our next scheduled meeting on <br /> 15 November 2001. By 31 January 2002,KMEP will submit a comprehensive site summary <br /> that includes previous and current investigation data in order to complete a site-wide feasibility <br /> study leading to the development of a final remedial action plan. <br /> Please contact me at least 3 working days in advance of the field work with a field schedule so I <br /> may be present to obtain split samples from certain boring locations. If you have any questions, <br /> you may contact me at (916) 255-3082. <br /> MARY RRA <br /> Private ites Cleanup Unit <br /> cc: Mr. Carol Oz, San Joaquin County Environmental Health Department, Stockton <br /> Mr. Mark Wuttig, C112M Hill, Thousand Oaks <br /> California Environmental Protection Agency <br /> �a Recycled Paper <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. For a list of <br /> simple ways you can reduce demand and cut your energy costs,see our Web-site at http://www.swrcb.ca.gov/rwgcb5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.