My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COPPEROPOLIS
>
10848
>
2900 - Site Mitigation Program
>
PR0536777
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:26:06 AM
Creation date
6/18/2019 11:09:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0536777
PE
2960
FACILITY_ID
FA0021126
FACILITY_NAME
FORMER COUNTRYSIDE MARKET
STREET_NUMBER
10848
STREET_NAME
COPPEROPOLIS
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10311006
CURRENT_STATUS
01
SITE_LOCATION
10848 COPPEROPOLIS RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.James L.L.Barton • Former Countryside Market ' <br /> October 24,2012 Stockton,California <br /> Page 2 of 2 <br /> head treatment samples should be collected during routine groundwater sampling events to <br /> determine when replacement of the carbon is necessary and ensure the treatment system is <br /> reducing 1,2-DCA to concentrations below the MCL. SGI estimates the carbon in the lead bed <br /> will need to be replaced every 3,400 days. Final well head treatment design may be modified <br /> based on input from the property owner. <br /> Well Head Treatment Cost <br /> The current contract between SGI and DGS includes $5,244 for contingent well head treatment <br /> cost. The estimated cost for the installation of the proposed well head treatment system is <br /> $4,500, which includes equipment and subcontractor costs of$2,500. <br /> Schedule <br /> The work scope presented here is scheduled to be implemented following the approval of the <br /> RWQCB and should take approximately 30 days to complete. <br /> SGI appreciates the opportunity to conduct this work for you. Should you have any questions <br /> about the scope of work or any other issues with respect to this project, please call Greg McIver <br /> at (530) 272-4200. <br /> Sincerely, <br /> The Source Group, Inc. <br /> Greg McIver <br /> Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.