Laserfiche WebLink
AN— ,,, <br /> �w <br /> Ad <br /> sources Control Al 9 rd <br /> State Water Re <br /> John P. Caffrey,Chairman ' <br /> Peter M.Rooney - � .. r Governor <br /> Secretaryfor Division of Clean Water Programs ' <br /> pp <br /> al, 130. ie itn,California 95814•(916) 227-4463 FAX`�9tW 27 o Pt4 <br /> = p+�- <br /> �faiCindress: P.O.Box 944212•Sacramento,California•94244-2120 5 J <br /> Internet Address: http://www.swreb.ca.gov/-cwphome/ustcVfundhome.htm <br /> September 9, 1998 <br /> Mr. Marvin Rosato <br /> J.H. Simpson Co. <br /> 4025 Coronado Avenue <br /> Stockton, CA 95204 <br /> Dear Mr. Rosato: <br /> PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 12050 <br /> SITE ADDRESS: 4025 CORONADO AVE, STOCKTON <br /> I haveal of.cxsts to drill tw _ <br /> soi gs, sample and convert one to a monitoring well. Your request is pre-approved for <br /> $10,22 's amount differs from that which was requested because the workplan preparation <br /> already been completed and is,therefore,not included in this pre-approval and the total <br /> allowed for the drilling contractor has been limited to the adjusted low bid amount of$3,680. <br /> This pre-approval is given subject to the following provisions. <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it <br /> to remain valid. If a different scope of work becomes necessary,then you must request pre- <br /> approval of costs on the new scope of work. <br /> • The work products must be acceptable to the San Joaquin County Environmental Health <br /> Division. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. To make this easier, insure that your consultant <br /> prepares his invoices to match the format of the original estimate, and provides reasonable <br /> explanations for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all subcontractor invoices, technical reports, <br /> i applicable correspondence from the oversight agency. <br /> California Environmental Protection Agency <br /> Co Recycled Paper <br />