Laserfiche WebLink
' GENERAL DYNAMICS • • <br /> Additional Investigation — Round 3; SWMU21 Workplan, Revised November 2003 <br /> ' TABLE OF CONTENTS <br /> ' 1.0 INTRODUCTION ..................................................................................................1 <br /> 2.0 SITE DESCRIPTION AND PREVIOUS INVESTIGATIONS .................................2 <br /> 3.0 SCOPE OF WORK...............................................................................................3 <br /> 3.1 Safety Plan Preparation and Implementation.............................................3 <br /> ' 3.2 Permitting...................................................................................................3 <br /> 3.3 Targeted Assessment of TPI-Id and O&G Soil Impact................................3 <br /> ' 4.0 SAMPLE CONTAINERS, PRESERVATION, AND DOCUMENTATION..............5 <br /> ' 5.0 ANALYTICAL PROTOCOL AND QUALITY ASSURANCE AND QUALITY <br /> CONTROL (QA/QC).............................................................................................5 <br /> ' 6.0 INVESTIGATION REPORT PREPARATION ....................................:..................6 <br /> ' 7.0 SIGNATURE.......................................................:...............................:.................6 <br /> ' APPENDIX A— Letter from Analytical Laboratory, Dated August 6, 2003 <br /> 1 <br /> 1 <br /> 1 <br /> t <br /> CHOW ENGINEERING, INC. i <br /> 1 <br />