Laserfiche WebLink
PRIMEX TECHNOLOGIES <br /> Corrective Measures Study Workplan, EPA ID No. CAD 000 626 762 <br /> May 2000 <br /> CMS target cleanup criteria for petroleum hydrocarbons soils at this site is 1,000 <br /> mg/Kg. <br /> 3.0 PROJECT MANAGEMENT <br /> This section provides the CE personnel who will be responsible for implementing the <br /> CMS WP on behalf of PRIMEX Technologies, Inc. <br /> 3.1 Key Personnel <br /> The key technical and field operation personnel for this project are: <br /> Principal-in-Charge Reuben Chow, P.E. <br /> Senior Geologist Maurice W. Baron, Jr., R.G. <br /> • Project Manager Lisa Kimura, R.E.A. <br /> ■ Field Operations Manager Bruce Clark, R.E.A <br /> ■ Field Supervisor Rodger Berzinski <br /> Additionally, our experienced staff in safety, chemistry, environmental sampling, and <br /> equipment operations will support the project activities. Licensed drilling and analytical <br /> laboratory companies will be used as part of the project team listed below: <br /> ■ EnProbe. Oroville, CA and/or Gregg Drilling (drillers) <br /> ■ McCampbell Analytical, Pacheco, CA (DHS #1644 <br /> 3.2 Project Schedule <br /> It is anticipated that the CMS WP will be implemented and a completion report <br /> submitted to DTSC within 90-days of approval of this CMS WP by DTSC. The general <br /> schedule follows. <br /> CHOW ENGINEERING, INC. 3 <br />