My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
34580
>
3500 - Local Oversight Program
>
PR0544584
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2019 10:21:05 AM
Creation date
6/19/2019 10:14:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544584
PE
3528
FACILITY_ID
FA0003684
FACILITY_NAME
CASTLE ROCK FIRE STATION
STREET_NUMBER
34580
Direction
S
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25118003
CURRENT_STATUS
02
SITE_LOCATION
34580 S CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L %W04 �ftd <br /> LEquipment used for sampling which is in direct contact with the soil media, will undergo a more <br /> stringent decontamination process. The procedures are as follows: <br /> LBrush off loose dirt with a steel-bristle brush in the decontamination area; <br /> • Equipment is washed in Tri-Sodium Phosphate (TSP) detergent solution using plastic <br /> Lscrub brushes; <br /> I Following the detergent wash,equipment is rinsed with tap water; and <br /> L <br /> • As a final step, equipment is rinsed with distilled water and allowed to air dry. <br /> LThe clean equipment is then transfred to the clean zone. <br /> • Decontamination solutions are transferred to 55-gallon drums for storage prior to <br /> disposal. <br /> BOREHOLE ABANDONMENT <br /> All borings will be abandoned by backfilling with bentonite chips or a concrete-bentonite slurry. <br /> LThe backfill materials are poured down the hollow-stem auger and the augers removed in five <br /> foot increments. The down-hole hammer is used to insure that there is no bridging of the backfill <br /> materials. For bentonite chips, a small amount of tap(potable)water is added down the augers as <br /> Leach five foot flight is removed to hydrate the bentonite and form a seal against contaminant <br /> migration. This process will continue until the borehole is filled to within one foot of the ground <br /> surface, then capped with concrete to the ground surface. <br /> PROJECT DOCUMENTATION <br /> LDocumentation of each step in the drilling and sample collection procedure is essential to track <br /> and evaluate the validity and quality of the data that is generated. The following forms are used <br /> to document the investigation program: <br /> L <br /> • Soil boring log; <br /> Sample chain of custody form; <br /> Daily field work log, and; <br /> Drum inventory form. <br /> These forms contain much of the same information and are filled out by different members of the <br /> sampling crew, therefore, allowing a cross check of the sampling location numbers, sampling <br /> depths, sample numbers and analyses requested per sample. <br /> bw <br /> C-4 <br /> r. <br />
The URL can be used to link to this page
Your browser does not support the video tag.