Laserfiche WebLink
I <br /> Stockton 99 Speedway <br /> Preliminary Endangerment Assessment Workplan April 12,2007 <br /> 5.0 DATA MANAGEMENT AND REPORTING . <br /> 5.1 General <br /> This Is section contains information about procedures to be used for managing and reporting data from the <br /> analyses of the samples and use of this data as part of future phases of the project. The data quality <br /> objectives are selected to form a basis for project data management and information. Additional <br /> information regarding data quality, data validation and use of the data are presented in the QAPP, <br /> presented as Appendix B. <br /> f <br /> 5.2 Data Management <br /> 5.2.1 Data Quality Objectives <br /> Data quality objectives (DQOs) are qualitative and quantitative statements derived from the outputs of the <br /> initial project strategy discussions and steps of the DQO process that: <br /> • Clarify the study objective; <br /> • Define the most appropriate type of data to collect; _ <br /> • <br /> Determine the most appropriate conditions from m which to collect the data; and <br /> • Provide guidance on tolerable limits 'on decision errors that will be used as the basis for <br /> establishing the quantity and quality of data needed to support the decision. <br /> The DQOs are then used to develop a scientific and resource-effective data collection design. According <br /> to analysis of historical data and Site conditions, the following conclusions were reached to address the <br /> DQO definition presented above: <br /> • The objective of the PEA is to evaluate the nature and extent of environmental impacts at the <br /> Stockton 99 Speedway; <br /> • Historical data suggest that metals, TPH, VOCs; and organochlorine pesticides are the COP Cs at <br /> the Site; <br /> • This PEA Workplan will be followed to reduce potential decision-making errors. <br /> 5.2.2 PEA Data Quality Objective Process <br /> This section presents the data quality process for decisions during the PEA process. The seven DQO <br /> process steps are described with the corresponding PEA information below: <br /> PEAWaWan nW.a) 5-1 The Source Group,Inc. <br />