Laserfiche WebLink
Stockton 99 Speedway <br /> Quality Assurance Project Plan April 12,2007 <br /> I <br /> 2.0 PROJECT ORGANIZATION AND RESPONSIBILITIES <br /> 2.1 Field Sampling <br /> SGl personnel will perform the field sampling activities outlined in Section 4 of the PEA Workplan. Table <br /> ? presents the sample analyses based on sampling categories. The tasks that will be performed during <br /> field sampling include: <br /> p 9 <br /> Implementation of Site Health and Safety Plan; <br /> • Marking sample locations; <br /> Soil sampling; <br /> • Equipment and PPE decontamination; and <br /> • Sample documentation and transport arrangements. <br /> 2.2 Laboratory Analysis <br /> Laboratory analyses will be performed by the State certified analytical laboratory Advanced Technologies <br /> Laboratories (ATL), located in Signal Hill, California. <br /> i <br /> Quality_Assuarroa_Prgect_PlarLFinal.doc 2-1 The Source Group,Inc. <br /> f <br /> l <br />