Laserfiche WebLink
I <br /> Stockton 99 Speedway <br /> Quality Assurance Project Pian April 12,2007 <br />'4. maintenance as described in their laboratory QA Plan. Subcontractors are responsible for maintenance <br /> of all equipment needed to carry out subcontracted duties. A schedule for maintenance is presented as <br /> Table 5. <br /> E 7.1.5 Special Training and Certifications <br /> P <br /> All field personnel will be certified as required by the Hazardous Waste Operations and Emergency <br /> Response standard provided in 29 CFR 1910.120 (USEPA 1990) which sets forth the training <br /> requirements for hazardous waste clean up, treatment, and emergency response for field activities. In <br /> addition, SGI provides field technicians with specialized training for specific hazard constituents as <br /> warranted by the field activity and required in the task-specific Health and Safety Plan (HASP). <br /> F <br /> F <br /> I <br /> f <br /> r <br /> Quality_Assurance_Project_PIan.Final.doc - 7-3 The Source Group,Inc. <br /> I <br />