Laserfiche WebLink
Stockton 99 Speedway <br /> Quality Assurance Project Plan 'April 12E 2007 <br /> 8.7 Detection and Dilutions . <br /> If detection limits or dilution factors prevent meeting the DQO, the -laboratory will contact the Project <br /> i Manager. Re-analysis or re-sampling may be justified based on the DQO.. <br /> 8.8 Data Interpretation <br /> During data review, .the Project Manager may encounter results that do not correlate well with <br /> expectations, with other results, and with results from other methods performed on the same samples. <br /> This may trigger inquiries to raw data, such as chromatograms, that are not normally provided with the <br /> results. If laboratory duplicates do not show acceptable precision, procedures and records will be <br /> reviewed. Re-sampling maybe necessary if the data set falls below the 80% validated criteria. <br /> 8.9 Notification of Noncompliance <br /> The PEA Report will contain a narrative discussing data review.. The Project Manager will inquire into <br /> problems associated with the data: <br /> E , <br /> QualityAuuanoe_Projed Plan.Final.doc ` 8-2 The Source Group,loco <br />