My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012864
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
4105
>
2900 - Site Mitigation Program
>
PR0524283
>
ARCHIVED REPORTS XR0012864
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 10:38:56 AM
Creation date
6/20/2019 10:33:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012864
RECORD_ID
PR0524283
PE
2959
FACILITY_ID
FA0016289
FACILITY_NAME
LEGACY DEVELOPMENT INC
STREET_NUMBER
4105
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
13202014
CURRENT_STATUS
01
SITE_LOCATION
4105 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stockton 99 Speedway <br /> Quality Assurance Project Plan 'April 12E 2007 <br /> 8.7 Detection and Dilutions . <br /> If detection limits or dilution factors prevent meeting the DQO, the -laboratory will contact the Project <br /> i Manager. Re-analysis or re-sampling may be justified based on the DQO.. <br /> 8.8 Data Interpretation <br /> During data review, .the Project Manager may encounter results that do not correlate well with <br /> expectations, with other results, and with results from other methods performed on the same samples. <br /> This may trigger inquiries to raw data, such as chromatograms, that are not normally provided with the <br /> results. If laboratory duplicates do not show acceptable precision, procedures and records will be <br /> reviewed. Re-sampling maybe necessary if the data set falls below the 80% validated criteria. <br /> 8.9 Notification of Noncompliance <br /> The PEA Report will contain a narrative discussing data review.. The Project Manager will inquire into <br /> problems associated with the data: <br /> E , <br /> QualityAuuanoe_Projed Plan.Final.doc ` 8-2 The Source Group,loco <br />
The URL can be used to link to this page
Your browser does not support the video tag.