My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011653
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
0
>
2900 - Site Mitigation Program
>
PR0521409
>
ARCHIVED REPORTS XR0011653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 1:50:13 PM
Creation date
6/20/2019 11:46:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011653
RECORD_ID
PR0521409
PE
2950
FACILITY_ID
FA0014531
FACILITY_NAME
PLYMOUTH ROAD STORM DRAIN PROJECT
STREET_NUMBER
0
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
0 COUNTRY CLUB BLVD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CI OF STOCKTON <br /> Ca!Sierra Cpns>luciion <br /> ��SIiQTirO® 5904 Van Alstine Ave <br /> ' Carmichael,Ca 95608 <br /> Construction. Inc. Tel 91)4&5-3909 Fa)Cs,s 4as.asos <br /> RATING LEGEND <br /> • PROJ NAME PROJECT NUM RESPONSIBLE DATE <br /> PLYMOUTH RD STORM DRAIN CITY OF STOCKTON 10102@003 <br /> 0: Occurances without damage <br /> — for example, laterals,joints etc <br /> NO DEFECTS WERE DETECTED <br /> Constructional deficiencies or occurances with insignificant influence <br /> — to lightness, hydraulic or static pressure of pipe <br /> f e wide joints, minor deformation of <br /> plastic pipes, minor erosions etc <br /> REHABILITATION CAN BE SCHEDULED LONG-TERM <br /> r <br /> 2: Constructional deficiencies diminishing static, hydraulic and tightness <br /> 1 — f e open joints,cracks, minor drainage obstructions <br /> such as calcide build ups, protruding laterals, minor damages to pipe wall, <br /> indnndual root penetrations, corroded pipe walls etc <br /> ' REHABILITATION IS NECESSARY MEDIUM-TERM WITHIN 3 TO 5 YEARS <br /> ' 3: Constructional damages with nonsufficient static safety, hydraulic <br /> or tightness <br /> f e axial/radial pipebursts, pipe deformations,visually noticeable <br /> infiltrationlexfiltration, cavities in pipe-wall,severe protruding laterals, <br /> REHABILITATION PROCEDURE IS URGENT AND HAS TO BE <br /> COMPLETED WITHIN 1 TO 2 YEARS NECESSITY FOR EMERCENCY OPERATIONS <br /> HAS TO BE EXAMINED <br /> ' 4: Pipe is already or will shortly be impermeable <br /> f e collapsed pipe,deeply rooted pipe or other drainage obstructions <br /> Pipe loses water or danger of backwater in basements etc <br /> 1 <br /> • REHABILITATION IS URGENT AND SHORT-TERM IN ORDER TO PREVENT <br /> FURTHER DAMAGE, NECESSARY TEMPORARY SPOT REPAIR HAS TO BE <br /> ' CONDUCTED ON EMERGENCY LEVEL. <br /> ' STOCKTON SD mdb H PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.