Laserfiche WebLink
WEAL MONITORING DATA SHEET <br /> Project -#: ' — Zf Client: r44 46� ?ZOR5111 <br /> Sampler: r� %r Start Date: nl <br /> Well I.D.: �_(� Well Diameter: (D 3 4 6 8 <br /> Total Well Depth: . 2g' Depth to Water: Z'53- <br /> Before: After: Before: After: <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: vc Grade D.O. Meter (if req'd): Ysl HCH <br /> Purge Method: Sampling Method: Bailer---'- <br /> Bailer Waterra Disposable Bailer <br /> Disposable Bailer Peristaltic Extraction Port <br /> Middleburgl� Extraction Pump Dedicated Tubing <br /> Electric submersible Other Other: <br /> Well Diameter Multiplier Well Diameter MUItiulier <br /> 1" 0.04 4" 0.65 <br /> . � (Gals.)X 5 — � _Gals. <br /> 2" 0.16 6" 1.47 <br /> 1 Case Volume Specified Volumes Calculated Volume art 0.37 other radius''0.163 <br /> i <br /> Time Temp (°F) pH Cond. Turbidity Gals. Removed Observations <br />• / / CAS Cr1 • l�'� /e- 0 <br /> Did well dewater? Yes o Gallons actually evacuated: 5--- <br /> Sampling Time: //S Sampling Date: 1, p1 <br /> Sample I.D.: c5 Laboratory: <br /> tl <br /> Analyzed for: PH-G TE TB TPH- Other: <br /> Equipment Blank I.D.: @ Tunr Duplicate T.D.: <br /> Analyzed for: TPH-G BTEX MTBE TPH-D Other- <br /> D.0. <br /> ther:D.O. (if req'd): Pre-purge: mg/L Post-purge: mg/L <br /> ORP (if req'd): Pre-purge: mV Post-purge: mV <br /> Binine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />