Laserfiche WebLink
Y � WPWRI _ <br /> Paw <br /> INTERNATIONAL TECHNOLOGY CORPORATION <br /> 1W <br /> R; V. SITE HEALTH AND SAFETY PLAN <br /> V.I INTRODUCTION <br /> This health and safety plan prescribes the work--place procedures which will be <br /> ` followed during the soil and ground water assessment of the BP Oil site #11192 . <br /> located at (1403 Country Club Blvd.; Stockton, CA.). - The provisions of this. <br /> !~' plan are mandatory for all IT personnel and subcontractors assigned to this <br /> protect. All authorized visitors to the site will be required to abide bW:_the <br /> a. procedures, The raquirernents in this plan may change due to changes in work <br /> lvconditions. however, no changes will be made without prior.written approval of <br /> �.. <br /> C. Brownlow, the Health and Safety Consultant and G.R. Millikan, the Project <br /> Manager. <br /> `YInternational Technology;Corporation is committed to prcvidin9%a safe and {' I <br /> heathful working environment for all its employees and subcontractors (see ITC <br /> �. Pro. 9000 for IT's Heb"Ith and Safety Policy). <br /> V.2 ASSIGNMENT OF RESPONSIBILITY <br /> I;d <br /> V.2.1 Project Manager <br /> L <br /> IT's Project Manger will be G.R. Millikan, who will be responsible for <br /> oversight and management of the project. G.R. Mil'A kan will be responsible for <br /> the implementation and management of the health and Safety Plan. <br /> V.2.2. health and Safety,Consultant <br /> C. Brownlow, IT's Safety and Health Manager in Martinez. CA or an ITES <br /> designee will visit the site periodically.: and dw ring critical phases of the <br /> project. The Health and Safety Consultant is responsible for preparation of., _ <br /> this plan. <br /> : <br /> F` 4 1 <br /> ` ✓� ":` SER300 <br />