Laserfiche WebLink
tasks, giving t,-get completion dates for s-gnificant <br /> milestones. <br /> T� Contractor will forward three copies of preliminary draft <br /> report for BP Oil review, then five copies of the final <br /> assessment report. <br /> BP ail will provide to the contractor the following <br /> information, if available: <br /> Plot plan of the facility; <br /> Existing soil boring and monitor well logs; <br /> Name and telephone number of company <br /> aepresentative; <br /> Prior to the commencement of work, the contractor will meet <br /> at the facility with the environmental coordinator, company <br /> representative, retail marketer, and station dealer or <br /> station manager. This meeting should resolve (1) field work <br /> start date (minimum 3 days of advance notice to station <br /> personnel) , (2) general field work and inconvenience that <br /> should be expected, (3) duration of',field work. Potential <br /> general recovery concepts will be discussed with the <br /> applicable retail personnel at that time. <br /> c <br /> ris <br /> j , <br /> l' <br /> r <br /> i <br /> . j <br />