Laserfiche WebLink
ELMWOOD AVE <br /> i <br /> EXISTING AND FORMER <br /> i UNDERGROUND USED <br /> r OIL TANK <br /> 1 R <br /> SCALE ft <br /> AUTO <br /> 0 4QTO SERVICE <br /> SERVICE <br /> W <br /> Q <br /> oo 0 MW-5 CD <br /> z <br /> -8.07 z <br /> � <br /> MW-4 <br /> MW-7 T <br /> -7 84 MW-3 --8.12 <br /> -7.58 LLi <br /> FORMER w <br /> UNDERGRO ND z <br /> EXISTING UNDERGROUND FUEL TANK <br /> FUEL TANKS d <br /> 7 <br /> FORMER <br /> DISPENSER <br /> ISLANDS <br /> a <br /> 3 � <br /> a MW-2 <br /> U <br /> MW-1 <br /> MW-6 -7.95 0 <br /> -7.69 RLANTER <br /> COUNTRY CLUB BLVD SHM EqK <br /> EXPLANATION <br /> 0 GROUNDWATER MONITORING WELL * No' 978 <br /> yj <br /> (9 DESTROYED WELL F <br /> OF CAL <br /> -7.95 GROUNDWATER ELEVATION (FT, MSL) <br /> -8-;0 GROUNDWATER ELEVATION CONTOUR (FT, MSL) <br /> APPROXIMATE GROUNDWATER FLOW DIRECTION; <br /> �j APPROXIMATE GRADIENT = 0.003 <br /> Ral. 11 192Gm.dnq <br /> Bosamap from Msto Enginaaring Croup <br /> PREPARED BY BP Oil Service Station No. 11192 FIGURE: <br /> 1403 Country Club Boulevard <br /> Pam Stockton, California <br /> GROUNDWATER ELEVATION CONTOUR GAAP, PROJECT: <br /> engineering contracting firm JANUARY 19, 1999 DAC04 <br />