Laserfiche WebLink
• • i <br /> ALISTO Field Report / Sampling Data Sheet <br /> ENGINEERING Project No. 10-037-07-003 <br /> Date: 2 g g <br /> GROUP Address 1403 Country Club Day: M TokF <br /> 1575 TREAT BOULEVARD, SUITE 201 Contract No. H339131 City: StOCI(t011 <br /> WALNUT CREEK CA 94598510 295-1650 FAX 295-1823 Station No. BP 11192 Sam ler:,!_- <br /> DEPTH TO GROUNDWATER SUMMARY <br /> WELL SAMPLE WELL TOTAL DEPTH TO PRODUCT TIME COMMENTS:SEMI 'r It <br /> ID ID DIAM DEPTH WATER THICKNESS MONITORED 7 <br /> MW-1 V 4" 26.63' . 6 jj �V SEMI /DO NOT SAMPLE <br /> MW-3 4' 28.90' i� 0&6SEMI / DO NOT SAMPLE <br /> MW-4 4" 28.80' •`� 2- 0/U SEMI/DO NOT SAMPLE � <br /> MW-5 4" 43.98' - 31 SEMI /DO NOT SAMPLE <br /> MW-6 4" 38.97' ( SEMI / DO NOT SAMPLE <br /> MW-7 4" 139-61- p z 103 0 <br /> / FIELD INSTRUMENT CALIBRATION DAT <br /> pH METER 4.00 7.00 `� 10A0 cc�// TEMPERATURE COMPENSATED Y N TIME �L� _S WEATHER <br /> D.O. METER ZERO d.O. SOLUTION BAROMETRIC PRESSURE TEMP <br /> CONDUCTIVITY METER 10,000 T ITY METER 5.0 NTU OTHER <br /> LEAK DETECTOR : ALARM MODE NO LARM MODE <br /> Well IQ Depth to Watei Diam Cap/Lock Product Dept Iridescenceal. Time Temp 'F pH LE,fC. D.O. 0 EPA eDl <br /> LV -71 '' Y j loG 0 1) 710 J! 1-0XTPH-G/$TE> 1T <br /> Total Depth-Water Level= x Well Vol,Factor, x#vol,to Purge Purg ol. <br /> I t � ,rzS (U ��e� '7, C)2. �'U �• � 0 TPH Diesel <br /> 3 1 1 6 f 0 - �� � lD /lot) 1 . 7.Oq 1 3J 0 TOG 5520 <br /> Purge Method: OSurface Pump ODisp,Tube OWinch ODisp.Bailer(s)_OSys Po Z ' S 2 /2 32X 3, S' TIME/SAMPLE ID <br /> Comments: S"( 1115 , 112-0 <br /> PAGE OF� <br />