Updated Corrective Action Plan—Tosco(76)Service Station No 11192, Stockton, California <br /> June 26 2002 <br /> 48 Schedule <br /> The proposed activities detailed in the Work Plan will commence upon regulatory approval of this CAP <br /> GR proposes the following schedule for additional delineation and installation and startup of the selected <br /> remedial option <br /> 1 The five new groundwater monitoring wells and 10 ozone microsparge points are proposed to be <br /> installed by August 31, 2002 This installation date is tentative and is dependent on receipt of a <br /> drilling permit and driller availability, and is subject to change <br /> 2 Construction and installation of the ozone microsparge system is proposed to be completed by <br /> September 30, 2002 This completion date is tentative and is dependent on construction bids and <br /> subcontractor availability, and is subject to change <br /> 3 The additional subsurface delineation and ozone microsparge installation and system startup report <br /> will be submitted by November 15, 2002 This date is tentative and is dependent on schedule item <br /> No 's 1 and 2, above <br /> GR will take all necessary actions to insure that the proposed work is completed by the above dates <br /> . However,circumstances beyond our control may require rescheduling of the drilling or construction dates <br /> If rescheduling becomes necessary, GR will submit a revised schedule to the PHS-EHD <br /> 140245o8 16 <br />