Laserfiche WebLink
. Updated Corrective Action Plan—Tosco(76) Service Station No 11192, Stockton, California <br /> .lune 26 2002 <br /> According to information contained in the Water Quality Control Plan(Basin Plan)for the Sacramento <br /> River and San Joaquin River Basins,prepared by the RWQCB,Central Valley Region,dated September <br /> 1, 1998, the existing and potential beneficial uses for the San Joaquin River drainage basin are as <br /> follows <br /> • Municipal and Domestic Supply <br /> • Agricultural Supply <br /> • Industrial Service and Process Supply <br /> • Groundwater Recharge <br /> • Freshwater Replenishment <br /> • Navigation <br /> • Hydropower Generation <br /> • Water Contact Recreation <br /> • Non-Contact Water Recreation <br /> • Preservation of Rare and Endangered Species <br /> • Commercial and Sport Fishing <br /> • Aquaculture <br /> • Warm and Cold Freshwater Habitat <br /> • Estuarine Habitat <br /> • Wildlife Habitat <br /> • Preservation of Biological Habitats of Special Significance <br /> • Rare, Threatened, or Endangered Species <br /> • Migration of Aquatic Organisms <br /> • Spawning, Reproduction, and/or Early Development <br /> • Shellfish Harvesting <br /> No discharges (past or present) to surface waters at the subject site are known to GR <br /> Wetlands <br /> There are no wetlands in the vicinity of the site Per the Basin Plan and topographic maps, the closest <br /> wetlands are g eater than 4 miles west of the site, west of the San Joaquin River in the Grassland <br /> Watershed roc <br /> Groundwater <br /> Per the Basin Plan, the existing and potential beneficial uses applicable to groundwater in the San <br /> Joaquin Basin include municipal and domestic water supply,industrial process water supply,industrial <br /> service water supply, and agricultural water supply <br /> 140245 08 7 <br />