Laserfiche WebLink
Bim' Laboratories Inc <br /> TRC Alton Geoscience Project 11192 <br /> 21 Technology Drive Project Number [none] <br /> Irvine CA,92618-2302 Project Manager Anju Farfan Reported 09/12/05 14 16 <br /> Notes and Definitions <br /> Vt l The Continuing Calibration Verification(CCV)recovery is not within established control limits <br /> S09 The surrogate recovery on the sample for this compound was not within the control limits <br /> J Estimated value <br /> i <br /> A53 Chromatogram not typical of gasoline. <br /> A01 PQL's and MDL's are raised due to sample dilution <br /> ND Analyte NOT DETECTED at or above the reporting limit <br /> I <br /> dry Sample results reported on a dry weight basis <br /> RPD Relative Percent Difference <br /> BC laboratories The results in this report apply to the samples analyzed in accordance with the chain of custody document This analytical report must be reproduced in its entirety <br /> All results listed in this report are for the exclusive use of the submitting parry BC laboratories lnc assumes no responsibility for report alteration separation detachment or third parry interpretation <br /> 4100 Atlas Court•Bakersfield,CA 93308•(661)327-4911 •FAX(661) 327-1918•www bclabs com Page 22 of 22 <br /> I <br />