My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1876
>
2900 - Site Mitigation Program
>
PR0542421
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 12:25:09 PM
Creation date
6/21/2019 10:07:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542421
PE
2950
FACILITY_ID
FA0024377
FACILITY_NAME
COUNTRY CLUB BLVD/295950
STREET_NUMBER
1876
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12319101
CURRENT_STATUS
01
SITE_LOCATION
1876 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Neater Resources Contro�toard ; <br /> Division of Clean Water Programs <br /> Winston H.Hickox 1001 1 Street-Sacramento,California 95814-(916)341.5796 <br /> Secreta or Mailing Address: P.O.Box 944212-Sacramento,California-94244-2120 Gray Davis <br /> f <br /> Environmental FAX(916)341-5806-Internet Address: http://www.swrcb.ca.gov/cwphome/ustcf Governor <br /> Protection - <br /> December 11, 2002 <br /> DEC 2 0 Z�b2 <br /> Manuel &Mary Sanchez <br /> 1633 W Walnut StreetNVIROtd�v;t ;VICES <br /> Stockton, CA 95203 ��R1i�1�1SC R <br /> PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 1026, <br /> SITE ADDRESS: 1876 COUNTRY CLUB BLVD, STOCKTON <br /> I have reviewed your request, initially received on September 10, 2002, for pre-approval of <br /> corrective action costs. I have included a copy of the "Cost Pre-Approval Request" form;please <br /> use this form in the future for requesting pre-approval of corrective action costs. <br /> With the following provisions,the total cost pre-approved as eligible for reimbursement for <br /> completing the work associated with the December 2, 2002, cost estimate by Western Geo- <br /> Engineers (WEGE), is $105,102. The costs associated with the piezometer installation, pl <br /> test monitoring well iezometer, and recovery well abandonment over-excavation and air <br /> sparge/vapor extraction piping, are re-a roved for the amount shown above see the table <br /> below for a breakdown of costs). <br /> COST PRE-APPROVAL BREAKDOWN <br /> # Task Amount Pre-Approved Comments <br /> 1 Install 4 temporary piezometer 7,277.35 <br /> wells. <br /> 2 Conduct pump test according to <br /> specs of 10-14-2002 Workplan 11,668.25 <br /> Addendum. <br /> 3 Destroy 1 monitoring well,4 <br /> piezometer wells, and 2 recovery 7,814.95 <br /> wells. <br /> 4 Dewatering of excavation. 9,782 <br /> 5 Remove,characterize, and <br /> stockpile contaminated soil; install <br /> air sparge/vapor extraction piping; 68,559.55 <br /> and backfill and resurface <br /> excavated area. <br /> TOTAL PRE-APPROVED $105,10 <br /> California En vironment2l Pro tecdon Agency <br /> Z4' Recyc%dPBper <br />
The URL can be used to link to this page
Your browser does not support the video tag.