Laserfiche WebLink
WESTERN 1386 EAST BEAMER STREET <br /> WOODLAND CA 95776-6003 <br /> GEO-ENGINEERS (530) 668-5300, <br /> FAX(530)662-0273 � <br /> REGISTERED GEOLOGISTS wege@cal.net <br /> REQUEST FOR WELL DRILLER (C-57) BID (RFB) <br /> RE: Well Destruction UST site, Sanchez property located at 1876 Country Club Blvd., Stockton, <br /> California 95203. <br /> INTRODUCTION <br /> This site is being considered for closure. Before closure can be obtained all wells and the <br /> remediation system associated with this site must be removed and the site restored. <br /> SITE LOCATION AND DESCRIPTION <br /> The site address is 1876 Country Club Blvd., Stockton,CA. It is located at the southeast corner of <br /> the intersection of Mission Street and Country Club Blvd. (Figure 1). The property is located in <br /> projected Section 4; TIN; R6E of the MDB&M at approximately five feet above mean sea level. <br /> The north corner of the property at Country Club Blvd and Mission Road is at N37°58.044' <br /> Latitude and W1210 19.393'Longitude(Delorme sa 7.0). Figure 1 shows current site conditions. <br /> The property previously contained two 1000 gallon gasoline Underground Storage Tanks(UST's), <br /> product dispensers, and associated underground piping. Currently there are twelve 2 inch <br /> diameter PVC groundwater monitoring wells:MW2,MW3,MW4,MWS, MW6A,MW6B, <br /> MW7A, MW7B,MWSA,MWBB,MW9A and MW9B. One 4 inch diameter PVC groundwater <br /> recovery well: MW 10 and five '/ inch tubing soil gas sampling wells: SG-I, SG-2, SG-3, SG-4 <br /> and SG-5, see Figure 1,Table I and Traffic Safety—Figure 2. <br /> WELL DESTRUCTION (Drilling Contractor) <br /> San Joaquin County.Public Health Services, Environmental Health Division (SJCPHS, EHD), has <br /> approved the following destruction methods for the wells. <br /> Il <br /> 1.) Drill out casing and well construction material,tremie grout boring to surface. <br /> Wells MW-2,MW-4, MW-6A,MW-8A,MW-8B and MW-9A along with soil gas wells SB-1, SB- <br /> 2, SB-3, SB-4 and SB-5. <br /> 2) Remy any slough/debris fro5XeIl, pressure grout tremie method to surface, over <br /> drill upper €rve feet, place cement cap,oraSkfill boring with clean road base and compact <br /> place temporary concrete surface plug. 4 <br /> Wells MW-3,MW-5,MW6B,MW-7A,MW-7B and MW-913. <br /> i <br /> I <br />