Laserfiche WebLink
, <br /> FIGURE 2 <br /> CROSS SECTIONAL VIEW OF MISSION AVENUE ROADWAY LOOKING NORTH <br /> IN THE VICINITY OF 1904 COUNTRY CLUB BLVD , STOCKTON CA SHOWING <br /> INSTALLATION AND COMPLETION OF MONITOR WELL MW6B <br /> 3 25' - 10 75' <br /> West edge of pavement, 10"steel traffic box - - Center line of Mission Ave <br /> Mission Ave <br /> Pavement and `r Pavement and <br /> Concrete Gutter Roadbase ,f R se <br /> f <br /> 4 _ <br /> Cuickset concrete <br /> 2"diameter PVC <br /> Trilock schedule <br /> 40 well casing <br /> 8"diameter borehole <br /> backfilled by tremae <br /> method with grout <br /> (neat cement with <br /> <5%bentonite)on <br /> same day as drilled v <br /> a <br /> 0) <br /> N <br /> �--- Native Soil <br /> 2' layer of <br /> hydrated bentonite <br /> pellets > <br /> #3 Monterey sandeT' <br /> — <br /> 020 machine slotted casing o <br /> HORIZONTALSCALE <br /> ONE INCH = ONE FOOT Base of Monitor — <br /> VERTICAL COMPONENTS NOT Well at 29'below —_ <br /> TO SCALE, USE LABELED grade = <br /> JL <br /> MEASUREMENTS I A <br /> • <br />